Tamworth Regional Council (TRC) has now concluded an Expression of Interest (EOI) for Ray Walsh House (RWH) to gauge potential interest from the private market for the sale and redevelopment of the building. Options for RWH have been under consideration by councillors for a while now, and as a result of those considerations, Mayor Webb has included in our next meeting this coming Tuesday the 23rd of September a Mayoral Minute providing the General Manager instruction to take next steps. So I figured now is as good a time as any to put out some of my thoughts on the building and its future that I have been documenting over the last year.

This will be one of the most scrutinised and consequential decisions we make in this term of council, and will likely be the most important. The decision councillors make will decide the fate of a major asset of the Tamworth Region, an iconic building, the future direction of Tamworth’s CBD, and will have significant long-running impacts on TRC’s finances going into the future.

The TL;DR of this post is that my personal position is that I don’t hold an attachment to seeing Council operate out of the building. But I do agree that the building itself is an iconic part of Tamworth CBD, and I would like to see the building not demolished and restored by whomever may own and/or occupy the building into the future whether or not that’s TRC. And if TRC does choose to sell the building, I think we need to ensure the sale price is appropriately large enough to allow an investment into a lasting legacy for residents.

The Mayoral Minute being raised by Mayor Webb at next Tuesday’s meeting, instead of locking us into a direction, is seeking more up-to-date costing and valuations of RWH to help determine if Council should rehabilitate and re-occupy, and asking for some preliminary design and estimates of a new joint Council office and Visitor Experience Centre, which has been identified as a potential option amongst councillors. I’m supportive of this minute.

What’s Happened over the last year

Going back to last year during the council elections, RWH was a core election issue for very understandable reasons. Various candidates ran on it as their main issue. Some got on. The Tamworth Greens and myself personally didn’t run on RWH, but we also didn’t shy away from it if asked.

I’m going to discuss updates in relation to Ray Walsh House since the beginning of this term of council when I was elected, given that I will have to make decisions on the reality of the building’s condition from when I was elected. There is obviously a wider history here too (that I will inevitably touch on as I go). But it’s my intention to focus on what has happened since I was elected, rather than defending or taking shots at the decisions of the last council. For information about events in the previous term of council, a register of documents can be found here:

https://www.tamworth.nsw.gov.au/about/the-council/ray-walsh-house-remediation

As a (semi) quick recap of events since the election: at our first ordinary meeting of the term on 22/10/24, Cr Budd and Cr Sharpham raised a motion to create a working group to investigate the events surrounding RWH and facilitate a report back to council. It was suggested that this working group consist of newly elected councillors who were not privy to information from the previous term, the rationale being to ensure new councillors are brought up to speed about the history and condition of RWH. This was amended by both Cr Rodda and myself to change the motion to hold workshops for all councillors to inform us about RWH before being passed unanimously.

Then, at our next meeting on 12/11/24, Cr Mears moved a motion to supersede the resolution of the previous council from 28/05/24 where the decision to “resolve to not remediate Ray Walsh House for the purpose of reoccupation by Council staff and Council operations” was made. Cr Rodda also raised various questions with Notice in relation to RWH at this meeting, but I’ll get back to that later.

Some of the main alterations in Cr Mears’ motion would be to change the wording of the previous resolution to “resolve to review all options to remediate, or otherwise, Ray Walsh House for the purpose of reoccupation by Council staff and Council operations, if and/or when it is safe to do so”.

Changing the wording from “request the General Manager develop an options paper for the future disposal of Ray Walsh House” to “request that General Manager develop an options paper that includes all options for the future of Ray Walsh House. This is to include remediation, repurpose, redevelopment, or other options”.

As well as adding a new point requesting that workshops relating to Ray Walsh House include invitation to “industry professionals with expertise in remediation, renovation and replacement or remediation of all plant and equipment as required”. I believe this last point was intended to open an invitation to external industry professionals, which to my knowledge has not happened.

Since these resolutions, councillors have met three times for workshops dedicated to considering future options for RWH. One was in December last year which consisted of a tour of a section of the ground floor of RWH, the basement internal car park, and the plant room. At the time we were offered to also view the first floor (I think it was this floor from memory), but we collectively decided not to because the building without air conditioning was pretty hot, the higher floors are surrounded by windows which would increase the heat, and we already had a good idea of the current state of the building from what we had seen.

On a personal note, I’ve spent a lot of time in RWH over the years. My mum, until recently, worked for TRC, and Tamworth City Council pre-amalgamation, for over 25 years as a records clerk. Working within RWH until it was abandoned. So while I hadn’t had much to do with the building in the 15 or so years, I used to spend a lot of time there after school waiting for her to knock off in the same area on the ground floor that councillors got a tour of in December last year. So it was certainly interesting to see first-hand how the building has been completely stripped internally.

During this workshop we discussed possible options for the future of RWH. As this was an internal confidential conversation, I’ll be careful with what I say. But as has since been disclosed, during that conversation councillors discussed options to seek a valuation for the land and building, one of which was holding a formal EOI process to help gauge what potential options for the site could come from the free market.

In March we had a second workshop to review a draft version of the now concluded EOI, and ask questions about the process before it was released publicly. We also were updated on some potential alternative site options for re-consolidating council staff under one roof that have had preliminary investigations done.

Following that workshop, the EOI was made open for public submission on 04/04/2025 to gauge what private market interest is out there to help develop options for the forthcoming options paper. In the EOI documentation, TRC signalled that they are willing to sell the building and attached car park, depending on what plans to reactivate the site within the CBD are being proposed.

Something that was also publicly recommitted to as part of TRC’s communications about the EOI (which I’m happy to see) is after the conclusion of the EOI when the options paper for RWH’s future is released, a formal community consultation process for feedback will be undertaken in line with the original resolution from 28/05/24.

The EOI period closed towards the end of June. Two submissions were received, the record of which was displayed on the Tenders, Quotations and Expressions of Interest page of TRC’s website in July. As reported in the Northern Daily Leader on 15th July, the two expressions of interest received were from two companies: Lionheart Property Development (who have previously undertaken the redevelopment of the Leader Building in 2018, which is one of the sites that Council rents space in the Tamworth CBD to house staff in following the vacating of RWH) and 3Five Projects who are currently developing the Goonoo Goonoo Commercial Precinct in Hillvue.

The NDL article can be read here (but it is paywalled):

https://www.northerndailyleader.com.au/story/9015940/local-companies-could-be-interested-in-revamping-ray-walsh-house/

The third and latest workshop held was in early August to review and discuss the EOI submissions received. At this workshop, councillors went over the contents of the EOIs received, the draft options paper from the GM, and generally weighed up all options and considered what ideally we want to achieve at the end of this process. As has been publicly reported, we asked for additional figures and information as a result of this workshop.

Councillors also collectively met (but informally rather than a workshop) one more time in August to discuss ideas for a path forward without council staff involvement. This was something we agreed to do amongst ourselves to further develop ideas and attempt to reach a collective decision, with the idea that we would update staff once a collective decision was made. And the conversation had at this informal meeting forms the basis of Mayor Webb’s Mayoral Minute.

This Mayoral Minute is seeking the endorsement of councillors to formally instruct the general manager to begin three actions: Seek up-to-date costings on asbestos rehabilitation of RWH (with a view to get an up-to-date valuation of the building in its current state and an estimate of its value if it was rehabilitated to a safe standard), investigate the potential to build a new joint Civic Administration and Visitor Experience Centre at the site currently occupied by Hungry Jack’s and the Australian Country Music Foundation (the guitar building/old visitor information centre), and once up-to-date costings on asbestos rehabilitation of RWH is gathered to arrange a public meeting in the Tamworth Town Hall for councillors to undertake community consultation.

The body of the minute is as follows:

SUMMARY

This Mayoral Minute provides instructions to the General Manager regarding the initial actions that councillors expect to be taken with regard to determining the future of Ray Walsh House, including options for the future accommodation of our office-based staff in Tamworth, and the provision of a new Visitor Experience Centre (VEC).

COMMENTARY

RAY WALSH HOUSE

  1. The General Manager is to undertake the necessary actions to determine whether there is a financial benefit for Council to undertake the removal of the asbestos contamination and reinsulate the building. To be clear, this will include obtaining an up-to-date valuation of the building in its current state, an estimated value of the building if it was rehabilitated to a safe standard, and an estimate of the cost to undertake the necessary works. The valuations are to include the potential sale of the two car parks adjoining the building.
  2. Once the actions in (1) have been completed, the General Manager is to arrange a public meeting in the Town Hall for councillors to undertake community consultation, as per Council’s previous resolution, regarding the future of Ray Walsh House. An options paper, endorsed by councillors, is to be made publicly available at least fourteen days before the public meeting.
  3. The General Manager will receive further formal instructions regarding the future of Ray Walsh House following the outcome of the community consultation and a formal decision being made by Council at an Ordinary Meeting.

OFFICE ACCOMMODATION and VISITOR EXPERIENCE CENTRE

  1. The General Manager is to investigate the potential to build a new Civic Administration Building and Visitor Experience Centre on the site currently occupied by Hungry Jack’s and the Australian Country Music Foundation (ACMF) in Peel Street Tamworth. This investigation will include site suitability, planning considerations, and the development of a concept design and conceptual estimate.
  2. The new building concept is to be large enough to accommodate all the staff previously located in Ray Walsh House, provide for future growth, and include a minimum of 2,000sqm of floor space for a new VEC.
  3. The concept design and estimate is to be presented to Council for approval.
  4. If approved by Council, the General Manager will be instructed to engage a suitably qualified professional to provide a more detailed cost estimate to deliver the concept design.
  5. Estimated construction costs and the corresponding financial implications for Council are to be formally presented to Council.
  6. Current investigations to remodel the Hungry Jack’s building for use as a Visitor Information Centre only are to cease and alternatives considered for the short to medium term relocation of these services.

Council acknowledges that the above actions will come at a financial cost to obtain the valuations, develop a concept design and conceptual estimate for the office accommodation and VEC, and then have a professional quantity surveyor provide a detailed estimate of construction costs once the concept is approved. The General Manager is to formally present an estimate of the cost to undertake the above actions to an Ordinary Meeting of Council at the earliest opportunity.

Community raised issues

As mentioned above, we have had one other motion raised in relation to Ray Walsh House. At our 12/11/24 meeting, Cr Rodda raised various questions with notice for the General Manager to answer in relation to the actions taken since the abandonment of RWH, many of these coming from the community. I’ll copy Cr Rodda’s questions, and the General Manager’s answers below:

Q. Does Council have a register containing results of baseline health scans (respiratory system) of all staff that have worked in Ray Walsh House since amalgamation in 2004?

A. No scans have been taken of all staff. Staff involved in the initial incident where air conditioning ducting and vermiculite fell through the ceiling were taken for health monitoring at the time.

Q. What are the results of the scans?

A. Results of any scans are the privacy and personal information of staff and will not be disclosed to the public.

Q. If no baseline health scans of staff that worked in Ray Walsh House have occurred, why not?

A. The risks to staff were minimal until the failing of the air conditioning system, at which point staff were removed from the building. Council has commenced health monitoring by health professionals to identify changes in employee health status because of exposure to certain hazards in the workplace. The health monitoring may include skin checks, samples of urine or blood collected, audiometry testing and spirometry testing (lung function) depending on the hazards identified in the particular workplace.

Q. Many residents feel that Ray Walsh House was simply vandalised once staff left the building in 2022, as the vermiculite remains. In the interests of transparency, why were the tiles on the ground floor destroyed and the internal furnishings, fixtures and chattels removed from the building?

A. Ray Walsh House was not vandalised. Before the asbestos can be removed, the building needed to be cleared of all items and furniture. It was also determined at this time to remove the ceramic tiles and fixed items in the foyer, and throughout the building, as this would need to be done if Council was to remodel/renovate the building and move back in. This approach will save considerable time and expense once a final determination is made regarding the building.

Q. If asbestos contamination was at such levels as to warrant demolition of all floors, from the ceiling level down to below floor coverings, were all donated furniture, equipment and/or fittings forensically cleaned prior to being donated?

A. There was no asbestos on the furniture as the air conditioning system has not been turned on since the discovery of asbestos in the Plant Room and therefore it had not circulated.

Q. Why did the contractors not wear appropriate PPE while demolishing Ray Walsh House given the existence of vermiculite containing asbestos?

A. Asbestos would only circulate in the building if the air conditioning system was turned on. The contractors were not required to wear specialised PPE as there was no air conditioning in operation in the building during the works. The contractor had a comprehensive asbestos management protocol in place that would be activated if any of the vermiculite had been disturbed.

—

I’ve included all of Cr Rodda’s questions for completeness, but it’s the 4th question that I want to comment on further in relation to where to go now. As I stated in my regular business paper summary post at the time, the question of why it was decided that internal fixtures were to be removed remains the big unanswered question during the last term of council and last year’s local government elections. And while I could be wrong about this, this is the first (and to date, remains the only) time I have seen this question answered publicly by TRC.

It’s worth bringing up that the answer given doesn’t quite capture what has been discussed internally with councillors: that TRC was following the advice of Public Works to approach rehabilitation of the building in two steps: 1. to internally demolish the building to allow for the next step, 2. to remediate the asbestos containing material on the structural steel floor members. Re-reading the answers given with that context I think helps understand the answers given a bit better. Regardless, the answers given have raised various other questions within the community that I think are valid.

But with a focus on the decision before councillors this term, I think it raises the question that in the reality that this internal demolition work has been carried out at TRC’s expense, and that it will save considerable time and expense not just for TRC if it were to rehabilitate and re-occupy the building, but also for a potential buyer of the building to reactivate the site, will the prepped condition of the building be a consideration when determining a potential sale price?

Where to go from here

All of that brings us up until now, with Mayor Webb’s Mayoral Minute to start taking steps forward coming before councillors at next Tuesday’s meeting. The history of RWH remains controversial and confusing and will continue to do so. But I’m looking down the barrel of making a decision of where to go from here, and while keeping in mind how we got to this point, I need to evaluate what options are available from where we are now.

It’s pretty clear that TRC doesn’t have the funds to pay for the remediation of the building readily available. Even if the State and Federal Government came to the table with funding for remediation, TRC would almost certainly need to secure funds for a major co-contribution still. And I don’t have any faith that other levels of government are going to be willing to chip in funds in the first place, let alone the bulk of funding. Both because a council admin building isn’t the sort of asset politicians want to be seen cutting a ribbon on, and because I believe our region is considered politically irrelevant to both major parties due to our status as a safe Nationals seat across tiers of government. So when it comes election time and the cheque book comes out, we’re not a target seat and we miss out.

Being that whatever direction we take is going to be an expensive endeavour, what it looks like we are going to have to do is take out a loan. Whether that be for remediation ourselves, a potential co-contribution, or for a new build. But there are already various other big ticket projects underway or in the works that have effectively put TRC at a borrowing cap. The aquatics centre and the skywalk have already been committed to by the previous council. And some upcoming important infrastructure builds like the Organics Recycling Centre and the Industrial Water Recycling Plant are quickly going to be upon either this or the next council. And personally, I reckon with the next drought looming, the Water Recycling Plant is this most important piece of infrastructure for the future of Tamworth City and the wider region, more so than a new council building.

There has been suggestion in the past that a new council office and chamber could be co-located and worked into the design of a Performing Arts Centre construction. To me, this is the ideal solution if possible. I’m enormously supportive of a performing arts centre that our region needs for our cultural and economic growth. And I could see a co-location of the two happening if funded. As we continue to cost out options, this will be something that I continue to keep in the forefront of my mind.

But the above issue remains that we already need State and Federal Governments to come to the table with funding for the Performing Arts Centre minus administrative offices being incorporated. We have for years, and that continues to not have eventuated after years of campaigning from both TRC and the community.

And I do also think that we need to reactivate that current massive hole in our CBD. I’m sympathetic to the argument that a potential consolidation of council staff under one roof outside of the CBD (while it would be a massive boost to whatever the area outside of the CBD may be) would be a further blow to the CBD economy. And in the meantime, RWH continues to sit as an empty shell in our CBD costing ratepayers money.

All this considered, in the reality of the situation we currently are in, I hope you can see why I think the Tamworth community should be open to the discussion of selling the building. If that was to happen though, I personally think councillors should push two unconditional factors that would need to be met by a potential buyer for the benefit of the community that currently owns the building.

Personally, I don’t want to see RWH demolished as part of the reactivation process. It’s an iconic part of not just Peel Street, but Tamworth City. Its monumental presence and brutalist design is an ingrained part of the identity of the city. And as a member of the heritage committee especially, I feel like that’s a viewpoint that needs to be championed in this discussion. Significant restoration works will need to be done to the exterior of the building to bring it up to code as part of any restoration now that the internals have been stripped (something that also needs to be kept in mind when considering the decision for internal demolition). And I think we need to expect the façade of the building to change somewhat to make that happen. But we see the externals of buildings remaining true to their historic buildings and structures during restoration all the time. Personally I think a commitment to maintaining the external character of RWH should be a key consideration in councillors’ upcoming deliberation on behalf of residents.

And if residents are going to give up ownership of the building, I think the community needs to get appropriate value for it. Back in 1976, RWH was constructed for just over $5 million to be the home of the Peel-Cunningham County Council electricity body (and other tenants). In 1997, Tamworth City Council purchased the building for $4.5 million. I’ve heard arguments that the building has run the course of its life in depreciable value, but I don’t entertain this line of thinking and believe that RWH remains an incredibly valuable asset. Not even considering the potential value of the 5-storey structure (including basement car park) itself, let’s think about the land value.

The building has a gross floor area of 9,840m², before including the adjacent outdoor car park, stretching from a prime location fronting Peel Street (the main street of one of major regional centres and growth areas in NSW) through to Kable Avenue (which TRC has major long term plans of beautification and urban redevelopment for) adjacent to Bicentennial Park.

That’s why I’m supportive of what’s being put forward in Mayor Webb’s Minute. Specifically because of this inclusion: “To be clear, this will include obtaining an up-to-date valuation of the building in its current state, an estimated value of the building if it was rehabilitated to a safe standard, and an estimate of the cost to undertake the necessary works. The valuations are to include the potential sale of the two car parks adjoining the building.”

I think it’s appropriate to get costings for both Council rehabilitating and re-occupying RWH, as well as for a new build. Of the new build options, rough designs and costs for a combined Performing Arts Centre/Council offices is already known. And as addressed with this line in the Minute:

“Current investigations to remodel the Hungry Jack’s building for use as a Visitor Information Centre only are to cease and alternatives considered for the short to medium term relocation of these services.”

TRC has been investigating moving the Visitor Information Centre (VIC). Although I do tend to think the Golden Guitar would be well positioned to continue along Goonoo Goonoo on the Southern Entrance to town from Sydney Highway, I think it’s pretty uncontroversial to say that the density around the VIC has made it a pretty poor spot (as an aside as a former cameraman, it can be tricky to get a good shot of the Golden Guitar without getting the KFC Drive Through in the background). Hence why the idea of a new consolidated Visitor Experience Centre has been floating around for a while now. And for me personally, if the costs for VEC were incorporated into this potential new building were favourable, while not the Performing Arts Centre I advocate for, it’s something I would consider in line with wanting to see a lasting legacy benefit to the community.

With all that in mind, councillors will be making this decision as a representative of, and on behalf of, the residents that elected us to this position, and I know not everyone is going to agree with my assessment and thoughts here. So in addition to the pending previously committed to community consultation on the option paper for Ray Walsh House’s future, I want to know what you think ahead of this Mayoral Minute coming to the next council meeting. Let me know. You can put it in the comments and I will read it. If you’re more comfortable with a private conversation feel free to send me a message or an email (although this is going to be a massive weekend of council meeting prep for me, so apologies in advance if I don’t get back to you right away). I’ll make sure to convey what I’m hearing from residents with other councillors.