Progress Report – Council’s Sustainability Strategy

There is an item at our Council meeting next Tuesday that is of particular interest to me, as it largely comes from a motion put forward by me calling for an update on where TRC is up to in implementing our Sustainability Strategy. Back at our first June meeting I raised various questions with notice about this, and requested an updated report to come to Councillors before the end of the year. You can read those questions here:

https://ryanbrooke.au/questions-with-notice-how-is-council-tracking-on-targets-set-in-the-sustainability-strategy/

The accompanying commentary for this report in the business paper advises that this is intended to both give an update to Councillors (and being available in the meeting’s business paper, the public) on the status of the Sustainability Strategy as well as to close out the strategy in preparation for the development of the next strategy, due next year.

The Action Plan contains 243 actions. Of these actions 103 have been completed, 99 have been completed for 24/25 FY, but are ongoing for 25/26 FY, 15 actions are on hold and 26 are not started or overdue. For ease of reading, I’ve copied across each action, the update provided on that action, and the action’s status below.

Actions are listed in the order they appear in the report, sometimes actions are listed out of order to group similar actions together. The action code listed relates to what directorate within Council is responsible for the action, which for the majority of items is the Sustainability Unit and the broader Water and Waste directorate it lives in. Where relevant, I’ve also included my comments on particular actions that I’ve sent to Council staff internally.

Actions are grouped into core priorities in the Sustainability Strategy: Water, Waste, Circular Economy, Energy, Natural Environment, Transport and Mobility, Sustainable Governance, and Climate Change.

Water

In consultation during the development of the Sustainability Strategy water was identified within the community as the number one area of focus in regards to sustainability, for obvious reasons given Tamworth’s historic water access issue.

The progress that has been made during 2022 is positive. I’m especially happy to see changes to TRC’s Development Control Plan (a core document for Councils that provides detailed planning and design guidelines for developments within the Council’s Local Government Area) to require sustainable design elements relating to water use and conservation to be implemented within construction projects. A notable area that requires more action though, as per the updates given in the report, is implementing water capture techniques in landscape and stormwater infrastructure. This is often called Water Sensitive Urban Design or Sustainable Drainage Systems. Greater implementation of those designs has been called for in TRC’s Urban Stormwater Management Plans.

Of course making better, more sustainable use of what rainfall we do get is always going to be a key focus of water security. But to secure Tamworth, Kootingal and Moonbi’s water supply we must also move away from reliance on rain water by embracing water recycling, and moving Tamworth’s various abattoirs off of town water with the proposed Industrial Water Recycling Plan will be a massive leap towards security. And we continue to wait for the State Government’s business case on the plant, which is due by the end of the year.

Waste

There are a lot of similarities between the progress made on water and waste. A lot of work has gone into DCP, governance and policy changes to encourage waste reduction in the first instance, and then separation and re-use to divert from landfill when waste is generated. A lot of this focus has been in construction, but household and business waste plays a large role in reduction mechanisms too.

On that front, an initiative to allow residents to recycle soft plastics directly into yellow bins called Curby was introduced several years ago in a trial phase, which has recently been continued post-trial. Since its implementation over 28 tonnes have been diverted from landfill for recycling. Further to that another 30 tonnes of hard to dispose of household waste (such as gas bottles, paint and batteries) have been diverted from landfill at the Community Recycling Centre operating at the Forrest Road Waste Facility.

Looking at actions to take into the future on this, I would personally like to see greater focus on encouraging waste sorting and recycling from commercial premises in addition to household waste. TRC is also looking into various recycling industries to be established and operate out of our LGA. Work to create hard plastic and moulded pulp recycling facilities are underway, and a trial to separate incoming waste at the Forrest Road Waste Facility is stated as being incoming. The big pending infrastructure project in this area though is the proposed Food Organics and Garden Organics processing facility to turn green waste and animal byproduct into compost and mulch for re-use. Products will be incredibly beneficial for our region’s agriculture industries and households alike.

Councils across the state won’t be allowed to put food and garden waste into landfill from 2030. Currently TRC runs an organics composting centre as part of the Forrest Road Waste Facility, but it’s already operating at capacity. So work has been underway for years now to design a dedicated facility for this, and we should be seeing construction start within this Council term. Once operating, this facility will not only be a revenue-generating operation within TRC, but we will have the capacity to divert food waste, of which it is estimated 312kg per person is generated each year in Australia, from landfill into beneficial compost. A lot of the big actions from this strategy are essentially on hold until this facility is operational.

But of course, the ultimate solution to waste is to not generate it, and to find ways to re-use products and materials. That leads us nicely to the next focus area.

Circular Economy

The very exciting update for me to come from this report in relation to Circular Economy is that work is underway into establishing a potential Reuse & Repair Centre (where items are diverted from landfill to be repaired if needed and given a new life) that could also encompass hosting a tool library or library of things (where items that are useful, but only have occasional use for most people can be borrowed and returned instead of needing to be purchased. Think power tools, sewing machines, camping equipment, generally stuff that you have bought but stays in storage most of the time). An expression of interest process about establishing such a facility is advised as coming within the next 12 months.

While on this topic, it’s also advised the greater implementation of a Library of Things within the Tamworth Library is being looked into. Something I didn’t know until I asked about setting up such an initiative internally in Council is that the Tamworth Library currently has a collection of cooking items like baking sheets available at the Library to borrow.

On a less exciting note, it’s also advised that an action to develop a Circular Economy Road Map for the LGA has not been started due to lack of resources. This is something I hope Councillors will support addressing.

Energy

Two major projects have taken place over the last few years in this area. A change of globes in street lighting over to more efficient and cost-effective LED globes, and an audit of Council’s energy-using facilities to identify ways to implement energy savings.

That latter you will see comes up a lot when reading through the progress report, because a large portion of the energy-related actions have either been incorporated into the energy audit, or require the outcome of the energy audit as a prerequisite for further actions to be undertaken.

It is advised that the energy audit report will not be complete this year, but I have asked for an ETA. I’m going to be very interested to see what recommendations are put in front of Councillors for consideration as a result of the audit. Both to see the potential for, and impact of, power savings due to identified opportunities for more energy-efficient operations. But also because transitioning to renewable sources of energy are going to be probably the single largest contributing factor to meeting targets in our upcoming Emissions Reduction Plan (Net Zero Plan).

Natural Environment

Once again, big sections of the action items identified in this area are reliant on updated baseline biodiversity mapping of the LGA, which has been ongoing and was advised in my previous Questions with Notice to be on track for completion by the end of the year. This project report states that this new mapping is currently in draft form.

There have been various updates to TRC’s Development Control Plan in relation to requiring developments to meet specific requirements so as to reduce effects on environmental factors, which I’m happy to see. It’s advised that subsequent changes to TRC’s Local Environmental Plan (which sits above the DCP in terms of key planning hierarchy) are yet to be implemented and waiting on the updated biodiversity mapping to be finalised and published.

The progress report also details various actions taken on ongoing efforts for land and river health as part of initiatives like the Urban Stormwater Management Plan and the Peel River Environmental Improvements Project. Urban lands are half the equation, and TRC recently put the draft Rural Lands Strategy on public exhibition. Something that was noticed by Cr North and myself was a lack of biosecurity considerations for a Strategy focused on the value of rural lands. In a future iteration of the Sustainability Plan, I would like to see more consideration of this, backed up by greater resourcing of the Biosecurity Unit within TRC. To that end, Cr North and I recently raised various Questions with Notice and a motion calling for a further report to Councillors outlining requirements to increase actions in this area. You can see those questions here:

https://ryanbrooke.au/questions-with-notice-councils-prevention-and-containment-process-for-invasive-animal-and-weed-species/

Transport and Mobility

This area largely focuses on electrification of TRC’s fleet vehicles and steps to increase the active transport network through infrastructure roll-out. For the former, most actions have been captured in the Electric Vehicle Strategy and Charging on Public Land Policy which was adopted last year which has increased efforts to encourage EV charging infrastructure in the region. Although not much action to transition TRC’s vehicles past feasibility studies, there is some interesting information included about electrification of other assets such as lawnmowers and whipper snippers and the benefits TRC has seen from this.

As for active transport actions, these are largely all ongoing and dependent on receiving grant funding for extensions to the region’s active transport network. It’s worth noting here that like the Sustainability Plan, the Active Transport Strategy is due to be renewed within the next 12 months, and I’m keenly looking forward to seeing and contributing to this draft renewal.

Noticeably lacking mention by comparison is initiatives to boost public transport options. Although this is difficult beyond expanded bus routes without a critical mass of population, it is mentioned that increased transport routes to the airport needs further consideration.

Sustainable Governance

This refers to the practice of incorporating sustainability actions into Council’s general operations as an omnipresent consideration. A lot of the actions in this area have crossover with actions covered in other sections, with focus on initiatives such as incorporating requirements to measure and/or consider things such as recycled materials, decommission pathways, asset lifespan, and carbon impact into procurement and project management frameworks.

A comment I will add here is that as the head of the organisation, Councillors have a particular role to play here in pushing for sustainability to be a constant consideration, as well as keeping it at the forefront of our minds in our own decision-making.

Climate Change

This is the focus area I think has had the least progress, despite that mitigation and adaptation will increasingly become vital as we continue to see the effects of climate change. The big action that has been taken is the establishment of TRC operational emission tracking and the establishment of baseline emissions records. The report advises that recording of emissions over subsequent years has continued to fill data gaps identified. I have asked when this information will be released publicly.

Disappointingly, the report also states that the development of a climate change risk and adaptation plan, and downstream of this an Emissions Reduction Net Zero Plan has been put on hold. The reason given is that “further work is required in relation to this action before implementation to ensure no duplication across Council’s activities. Further work is required”. I have also asked for more detail on what this additional work is.

—

 

Water Actions

 

Action Code: W-WW-1

 

Action: Investigate opportunities to encourage water sustainability accreditation and ratings within the internal Council projects and within development applications approved by TRC i.e., NABERS

 

Update: In Progress – Briefing note complete. Internal consultation needed to explore feasibility of NABERS integration.

 

Status: Action Completed

 

Comment: I’m very happy to see an investigation happening to implement NABERS (National Australian Built Environment Rating System) ratings into internal Council projects and within development applications approved by TRC and look forward to seeing how this action progresses. Based on the update would it be fair to say this should be statused as completed for 24/25 FY but ongoing?

 

—

 

Action Code: W-WW-2

 

Action: Continue education around reducing water consumption for each season

 

Update: EVAP cooler education and seasonal water savings education occurs on a seasonal and annual basis.

 

Status: Action Completed

 

—

 

Action Code: W-WW-4

 

Action: Continue education around reducing water consumption for each season

 

Update: Council have continued sponsorship of national water week and water night 2022/2025 – Active participation and sponsorship for 2025 water week confirmed (20–26 Oct). Water education workshops Delivered – Reached over 1000 students across 10 local primary schools (30 June – 4 July 2025).

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-5

 

Action: Investigate ways to incentivise water treatment systems and alternative water use options in new developments and subdivisions

 

Update: Non-greening mechanisms around water were integrated into the DCP to assist in achieving the associated objective. Ways to incentivise above rebates was investigated in the 23/24 and 24/25FY – no additional viable options were identified.

 

Status: Action Completed

 

—

 

Action Code: W-WW-6

 

Action: Communicate benefits of greywater reuse

 

Update: Integrated into rebate scheme with a fact sheet. Greywater video content has been developed, to be distributed in the 25/26 FY.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-7

 

Action: Review water saving rebate list

 

Update: Rebate list reviewed and updates made. In 22/23, 23/24, 24/25 Council approved 1439 rebates with a spend $137,304.00.

 

Status: Action Completed

 

—

 

Action Code: W-WW-8

 

Action: Evaporative air conditioner study

 

Update: 91 evaporative air-conditioners were monitored over the project period. Data collection has been completed. Awaiting results from UTS and ISF, likely to be sent through by Dec 2025. Project was extended by UTS & ISF, as such action was extended into 24/25 FY.

 

Status: Action Completed

 

—

 

Action Code: W-WW-16

 

Action: Investigate opportunities in working with Namoi Unlimited around Sustainability, drought resilience, resilience, adaptation, and mitigation to combine resources

 

Update: Investigations were completed in 22/23 FY. Namoi Unlimited ceased operations 2023 no further action was possible.

 

Status: Action Completed

 

Comment: It’s unfortunate to see that Namoi Unlimited ceased operations, both in terms of the loss of potential sustainability initiative collaboration and as a North West ROC (Regional Organisation of Councils). As a consideration for a future iteration of this strategy, could I suggest investigating similar opportunities to W-WW-8, but with Regional Cities NSW, Namoi Water Alliance, or other relevant joint Council groups.

 

—

 

Action Code: W-WW-17

 

Action: Work with Automatic Metre Reader developer to establish customer interaction with AMR’S

 

Update: Educational video suite complete. Community-facing comms plan launched mid-2025 to drive portal uptake. A customer water portal, MyTRCwater, was developed as part of the overall Automated Meter Project. Council has invested in an engagement and marketing program for the customer portal use. Council has also received grant funding for community

engagement. To date approximately 4,000 customers have registered with the portal.

 

Status: Action Completed

 

—

 

Action Code: W-WW-18 and W-WW-19

 

Action: Develop Regional Drought Resilience Plan (Tamworth & Walcha Pilot Project)

 

Implement actions from the Regional Drought Resilience Plan – This is reliant on state and federal funding

 

Update: The RDRP was developed with local community representatives in 22/23FY. Federal Minister approval wasn’t granted until 17 May 2024. Due the delay in Minister approval, implementation grant funding was also delayed.

 

Grant funds obtained under RDRP program late 24/25 FY, working with comms to implement actions, to be finalised Nov 2025 (when funding ceases).

 

Status: Action Completed; Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-21

 

Action: Assess alternative water use and water capture options for high use Council buildings. Risk assess and prioritise recommendations, and Implement key recommendations from assessment

 

Update: Reports are generated with Aqualus to rank the highest water users in each directorate. Audits are then completed of these users and a report is given of key recommendations that could be used to reduce water usage or make the internal site more water efficient.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-22

 

Action: Investigate alternative water use options and water capture options for high use council assets such as roundabouts, residential parks, playgrounds etc. Work with Development Engineering to have engineering guidelines and standards reviewed for opportunities to implement recommended changes

 

Update: A lack of resources led to this action being delayed

 

Status: Overdue or not started

 

—

 

Action Code: W-WW-24

 

Action: Support appropriate sustainability community events relating to water

 

Update: Events supported include ‘Lets thrive’ waterwise gardening campaign, tour of Calala water treatment plant, education sessions for community and school groups in 22/23 FY to 24/25FY, development and launch of ‘Sonny the sustainability scout educational program, and Walter Smart & Friends – Water Education Workshops delivered to 10 local primary schools in 24/25 FY.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-26

 

Action: Working with relevant Teams to investigate options for incentivising commercial businesses to invest in reducing their potable water use

 

Update: Council started to participate in the non-residential benchmarking project with the Water conservancy in 2024, this is an ongoing project. Outcomes from this project will influence how this action is implemented. Also working with comms to promote business and commercial rebates.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-27

 

Action: Where requested, educate businesses and residents on ways to reduce their water footprint

 

Update: The water portal will play a big part in this action moving forward, educating the community on how to set leak detection alerts and high consumption limits will reduce water footprint across the whole community.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-28, W-WW-29, and W-WW-30

 

Action: Review of Demand and Drought Management Plans and implementation of actions from plans

 

Update: Completed in 2023, actions continue to be implemented.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-3

 

Action: Improve accuracy of water consumption data in Tamworth LGA through the use of the Automatic Meter Reader system by 2026 and use this to update the baseline for Tamworth’s water usage

 

Update: Automated meter installation and associated water consumption monitoring including customer access portal was finalised in February 2025. The system will continue to be developed to improve water consumption monitoring and reporting.

 

Status: Action Completed

 

—

 

Action Code: W-LC-1

 

Action: Complete DCP review to consider opportunities to further improve water sustainability outcomes / water sensitive urban design in landscaping

 

Update: The DCP was reviewed and updated 23/24 FY, with the updated DCP endorsed by Council July 2024. The updated DCP includes greening and non-greening measures, which improve water conservation outcomes.

 

Status: Action Completed

 

—

 

Action Code: W-WW/LC

 

Action: Educate consultants, builders and internal project engineers on how to develop water efficient landscaping

 

Update: Changes to DCP assisted with improving water efficiency outcomes in landscaping. Further work required.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-9

 

Action: Complete Integrated Water Cycle Management Issues Paper

 

Update: Draft Completed, water security as focus.

 

Status: Actioned Completed

 

Comment: Could I read a copy of the Integrated Water Cycle Management Issues Paper?

 

—

 

Action Code: W-WW-10

 

Action: Complete Integrated Water Cycle Management Strategy

 

Update: Water Security Plan has been the focus this year. New RAF means strategic planning documentation may be overhauled.

 

Status: Completed for 24/25 FY but ongoing

 

Comment: What does RAF stand for in this context?

 

—

 

Action Code: W-WW-11

 

Action: Complete Integrated Water Cycle Management Water Security Plan

 

Update: Draft delayed due to Strategic Business Case investigation for surface water options for Tamworth being completed by the NSW Government, which may require the Water Security Plan to be modified

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-12

 

Action: Undertake Annual Pricing Review

 

Update: Completed every year.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-13

 

Action: Create a process to measure the benefit of reducing reliance on potable water to better target Council’s investments

 

Update: Not commenced.

 

Status: Overdue or not started

 

—

 

Action Code: W-WW/RS-1

 

Action: Establish a Capital Planning Framework, which includes consideration of sustainability

 

Update: Completed and implemented for the Water and Waste Directorate.

 

Status: Action Completed

 

—

 

Action Code: W-WW-14

 

Action: Update water model and undertake Servicing Strategy Confirmation

 

Update: Water model and servicing strategy confirmation completed.

 

Status: Action Completed

 

—

 

Action Code: W-WW-15

 

Action: Complete upgrade of Barraba WWTW Effluent Disposal System

 

Update: Review of licence conditions undertaken; project focus is updated OEMP for the site.

 

Status: Action Completed

 

—

 

Action Code: W-WW-25

 

Action: Investigate the construction of a water purification facility. Where feasible, pursue the construction of a water purification facility – reliant on state government support

 

Update: State Government’s Final Business Case is scheduled for completion later this year.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: W-WW-31

 

Action: Calibrate wastewater model and undertake Servicing Strategy Confirmation

 

Update: Wastewater model calibrated and servicing strategy confirmation completed.

 

Status: Action Completed

 

—

 

Action Code: W-WW-20

 

Action: Improve sustainable effluent management practices for all waste water treatment works

 

Update: Expansion of effluent reuse area in Tamworth has occurred with additional 90 hectares of irrigation being installed. Research programs in partnership with the Department of Primary Industries Agriculture have been completed to identify best crop types for long term effluent reuse farm sustainability.

 

Status: Action Completed

 

—

 

Action Code: W-WW-23

 

Action: Re-establish monthly sustainability and Operations meetings

 

Update: Complete for the period of 2022 to 2025. Not required in the future due to structural change.

 

Status: Action Completed

 

—

 

Action Code: W-RS-1

 

Action: Re-establish monthly sustainability and Operations meetings

 

Update: Complete for the period of 2022 to 2025. Not required in the future due to structural change.

 

Status: Completed for 24/25FY, but ongoing

 

—

 

Action Code: W-RS-2

 

Action: Continue to maximise the use of raw water and recycled water in construction projects where possible

 

Update: Road work teams continue to access raw and recycled water wherever it is accessible and viable.

 

Status: Completed for 24/25FY, but ongoing

 

—

 

Action Code: W-RS-3

 

Action: Convert more sports fields and open spaces to more sustainable or nonportable water supplies where feasible

 

Update: Improvement in irrigation practices has meant we haven’t needed to convert additional fields to non-potable.

 

Status: Action Completed

 

Comment: What are these improved irrigation practices? And how many fields and open spaces are watered with potable water?

 

—

 

Action Code: W-RS-4

 

Action: Investigate opportunities to incorporate Sustainable Drainage Systems (SuDS) principles into existing and planned publicly owned buildings, integrate WSUD and SuDS

 

Update: Work is underway but more is required.

 

Status: Completed for 24/25 FY but ongoing

 

Comment: Assumingly the work that has been under is actions taken as part of W-LC-1. Although notably W-WW-22 looks to contain related actions, and it is advised as not being started yet. Also notable is that these are three similar actions related to Water Sensitive Urban Design across there different directorates. They are in the Natural Environment section, but NE-WW-3, NE-RS-5, and NE-RSLC-1 also relate to this and crosses multiple directorates.

 

Is the work underway for this action related to W-LC-1, or is this different work being undertaken by separate directorates?

 

Waste & Resource Recovery Actions

 

Action Code: WE-All

 

Action: Investigate and where possible, create opportunities for new industries in Tamworth LGA around waste reduction and circular economy

 

Update: Council hard plastics grant was approved, and investigations around solar panel end of life processing opportunities continue.

 

Investigation of other opportunities such as moulded pulp is ongoing.

 

Alongside the broader local government circular economy network Council is investigating sustainable platforms for businesses to share their surplus material and how to localise where possible.

 

Circular Economy is becoming a priority for local government networks, as such this action has been extended.

 

Status: Completed for 24/25 FY

 

—

 

Action Code: WE-WW-!

 

Action: Investigate additional opportunities to encourage source separation at building sites

 

Update: Construction and Demolition Waste Audit was completed. This is followed by consultation with Builders and Construction Companies in 2 separate workshops.

 

Gate fees changed to encourage source separation.

 

Trial to be commenced to separate mixed construction and demolition waste at Tamworth Waste Management Facility.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-2

 

Action: Conduct an internal audit across the Organisation TRC to understand how our Organisation manages waste

 

Update: An internal physical audit was completed at nominated Council operational sites to look at the services in place and potential opportunities for further resource recovery or better waste management practices as a collective. As part of that process, staff surveys were also undertaken for consultation and feedback about their own specific sites, issues and thoughts and ideas. There are a number of challenges to consider and review such as logistics, any existing contracts, service provider availability, leased properties occupied, available space, who empties infrastructure in place, access to facilities, materials generated or retrieved, any materials sharing/reuse that occurs, and standard documentation, signage and training.

 

The audit seeks to identify service gaps and opportunities to increase resource recovery for the audited Council operational facilities across the region. Potential benefits are to reduced operational service costs, improve service availability and management, increase resource recovery or reuse and a have standard waste management related work practice documentation and waste management plans for applicable sites.

 

The Draft report and documentation are currently being finalised – will be completed by October 2025.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-2.1

 

Action: As part of the above action, a separate Waste Audit for TCMF was identified as a priority

 

Update: Tamworth Country Music Festival – Waste and Recycling Audit was undertaken to look at improving resource recovery potential, food waste volumes to consider potential diversion options in the future, signage and information and resource provided in Council’s camp grounds. There are a number of recommendations that are being considered for future festivals. Draft report received, Draft V2 Under review.

 

(Note – This was an internal Council operations focus, not external private venue focus).

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-3

 

Action: Implement actions from the waste audit. Prioritise actions that result in the implementation of required upgrades to waste infrastructure and waste processes

 

Update: Audit on C&D waste completed. Actions completed or underway (i.e., trial sorting in FY25/26).

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-4

 

Action: Review the construction environmental management plan, to ensure waste

management and segregation on work sites is occurring

 

Update: Template implemented – this is completed on project case by case basis

and as requested by the project manager.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-5

 

Action: Add “waste” to the environmental inspection checklist for Council owned facilities, focus on waste segregation

 

Update: Included in workplace inspections

 

Status: Action Completed

 

—

 

Action Code: WE-WW-6

 

Action: Investigate implementing bins for soft plastics, recyclables and landfill waste in all TRC Operational buildings

 

Update: Implemented in all TRC buildings with a kerbside service

 

Status: Action Completed

 

Comment: For a future iteration of this strategy, could I suggest an action to investigate initiatives to boost implementation of this in private business across the LGA?

 

—

 

Action Code: WE-WW-7

 

Action: Introduction of the waste wagon service

 

Update: This was implemented 2022, before it was extended. Review will occur end of 25/26 FY.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-8

 

Action: Review TRC’s internal waste service contracts and consider creating a centralised contract under a service delivery agreement

 

Update: Considered internalisation of certain processes. No further action on other contracted services at this stage.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-9

 

Action: Review TRC’s external waste service contract to identify the additional cost of

providing a weekly yellow bin service, and if this is supported by Councillors/the community

 

Update: Deferred until FOGO mandate impacts can be determined (FOGO mandates weekly collection, with alternative fortnight for waste and recycling) – due 2030.

 

Status: On hold

 

—

 

Action Code: WE-WW-10

 

Action: Implement Trial Curby Program and provide community education around the Curby (soft plastics recycling) for residential dwellings of the Tamworth LGA

 

Update: Implementation completed – December 2022

 

During the 2024/2025 reporting period the Curby program still operated as a trial 7.4 tonnes (t) of soft plastic were diverted from land fill. Overall, the program has collected a total of 28.3 ton since it started and there were 31,223 Curby QR Codes scanned in the Tamworth Region.

 

Status: Completed for 2024/2025 FY

 

—

 

Action Code: WE-WW-14

 

Action: Improve Curby participation and decrease contamination percentage

 

Update: Curby is a 3rd party program, Council was 1 of 12 Councils that has had the benefit of accessing the free trial.

 

Trial has ended, and changed to a subscription based model.

 

Council adopted the option to make available 10,000 Curby bags to residents for free, but it would not support the subscription costs for residents to participate in the rewards program and that would be an option for the resident to consider.

 

There are 2,571 platform users of the Curby program (combined subscribers and non-subscribers).

 

Curby received a 6 month grant from EPA which is supporting the implementation of a textiles trial, 71 community members have elected to voluntarily subscribe to the rewards program.

 

Status: Completed for 2024/2025 FY

 

—

 

Action Code: WE-WW-11

 

Action: Introduce FOGO system to Tamworth LGA

 

Update: Dependant on Organic Recycling Facility construction – has been delayed.

 

Status: On hold

 

—

 

Action Code: WE-WW-12

 

Action: Design and implement the education campaign for FOGO

 

Update: Actions are on hold until a final resolution for the Organics Recycling Facility (ORF) has been determined and construction commences.

 

Status: On hold

 

—

 

Action Code: WE-WW-19

 

Action: Investigate option to introduce community food organic and garden bins – work with waste services and community groups to roll this out.

 

Update: Actions are on hold until a final resolution for the Organics Recycling Facility (ORF) has been determined and construction commences.

 

Status: On hold

 

—

 

Action Code: WE-WW-37

 

Action: Consult with food waste generators concerning a dedicated commercial organics waste collection service.

 

Update: Actions are on hold until a final resolution for the Organics Recycling Facility (ORF) has been determined and construction commences.

 

Status: On hold

 

—

 

Action Code: WE-WW-38

 

Action: Prepare a commercial food waste organics options report for Council and a commercial food waste service methodology statement

 

Update: Actions are on hold until a final resolution for the Organics Recycling Facility (ORF) has been determined and construction commences.

 

Status: On hold

 

—

 

Action Code: WE-WW-13

 

Action: Record and maintain accurate data associated with waste management receival and resource recovery-data reported as per license conditions

 

Update: Mandalay data review (data collected at the Forest Road Waste Management Facility completed and changes made to the system.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-15

 

Action: Investigate responsible cafes program and seed café (i.e. green caffeine)

 

Update: This initiative went to Council 2021 and was over turned due to economic reasons. The action was reinvestigated in 2023 as part of this Strategy to see if the participation costs had decreased, however it was found they had increased. Action was closed.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-16

 

Action: Construction of the ORF

 

Update: Action on hold until a final resolution for the Organics Recycling Facility (ORF) has been determined and construction commences.

 

Status: Overdue or not started

 

—

 

Action Code: WE-WW-17

 

Action: Establishment of the Community Education Centre at TRC SMRF site

 

Update: On hold until a decision regarding upgrades to the small materials recovery facility (SMRF) is made.

 

Status: Overdue or not started

 

—

 

Action Code: WE-WW-18, WE-WW-22

 

Action: Identify opportunities for further resource recovery internal to Council i.e. waste infrastructure (Increase rollout of yellow bins in selected villages and in public places)

 

Update: Completed – Nundle Village Public Place Recycling Infrastructure installed by the team in Nundle in 2024/2025.

 

Manilla is the next CBD precinct to receive the public place recycling and waste infrastructure.

 

Cost of the bins across the Council area is an issue. This has slowed the roll out whilst alternative, more cost effective designs are investigated.

 

Status: Both Complete for 24/25 FY but ongoing

 

Comment: What is ETA on this being rolled out in Manilla?

 

—

 

Action Code: WE-WW-20

 

Action: Commercial and residential – review pricing of C & D waste and C & I waste

 

Update: Completed.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-21

 

Action: Investigate opportunities to incentivise select industries to improve source separation

 

Update: Completed – see earlier comments

 

Status: Action Completed

 

—

 

Action Code: WE-WW-23

 

Action: Create resource waste management plan templates for building and construction works.

 

Update: Waste Management Plan templates have been created.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-24

 

Action: Create resource waste management plan templates for the use of occupation / operational sites (Commercial and industries premises)

 

Update: Waste Management Plan templates have been created.

 

Status: Action Completed

 

—

 

Action Code: WE-WW-25

 

Action: Investigate opportunities to improve the waste management plan process through compliance checks (EPA and Department

 

Update: Investigation completed; no recommended actions identified

 

Status: Action Completed

 

—

 

Action Code: WE-WW-26

 

Action: Where appropriate create internal focused resource kit for events (including waste management plan, templates and source separation guidance

 

Update: Templates drafted, need to refine with the events in 25/26 FY.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-27

 

Action: Continue education around Community Recycling Centre (CRC) and problematic household waste

 

Update: Overall, 30.5 ton of CRC material was diverted from landfill. The following are the larger volume items:

– 15.5 ton of paint

– 6.2 ton of gas bottles

– 2.7 ton of fire extinguishers

– 1.5 ton of household batteries

– 1.2 ton of Fluro tubes

 

Other problem household wastes diverted from landfill overall:

 

– Motor oil – 28,700L

– Vehicle batteries – 33 ton

– Commercial fluros – 0.5 ton

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-28

 

Action: Continue education around Illegal dumping

 

Update: Council provides regular education at community events, schools education sessions and through Council’s social media platforms in relation to illegal dumping.

 

Council has a limited number of free asbestos test kits available to property owners and provided 15 kits to property owners of where 7 recipients sent samples in for testing and 3 samples tested positive for asbestos and 4 samples tested negative.

 

Sharps and Needle reporting – is ongoing and improvements to automate the provision of information associated with reported locations to our Crime Prevention Officer when staff document their action and responses, is in the process of being developed and implemented within the broader new technology software improvements for 2025/2026.

 

Further work required in relation to internal responsibility for illegal dumping and funding for addressing

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-29

 

Action: Continue education around reducing Litter

 

Clean up Australia Day – Seasonal

 

Update: Council continues to support the National Annual Clean up Australia Day activities in the community the first weekend of March and 800kg of litter was collected in our region.

 

This included the 35 unreturnable trolleys from the peel river that ended up in the metal waste for recycling. There were also 5 tyres recovered and sent for recycling.

 

Great feedback from participants is that there was minimal litter in their favourite community spaces, which is a testament to the ongoing efforts of our dedicated community members who continue these efforts throughout the year

 

Council provides regular education at school’s education sessions in relation to litter and litter free lunches and provides reusable car litter bags that are valuable to help retain small litter items in vehicles.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-30

 

Action: Develop a litter strategy for TRC LGA

 

Clean up Australia Day – Seasonal

 

Update: Grant funding submission to fund the development of the Litter Strategy that was available through the NSW EPA, grant application was unsuccessful.

 

Status: Overdue or not started

 

—

 

Action Code: WE-WW-31

 

Action: Review the general waste receival process to identify if it is possible to increase waste segregation rates

 

Update: This was included as part of the internal waste audit.

 

Status: Action completed

 

—

 

Action Code: WE-WW-32

 

Action: Review our current waste infrastructure to understand how we can improve it to change behaviour to increase source separation rates within the community

 

Update: This was included as part of the internal waste audit.

 

Status: Action completed

 

—

 

Action Code: WE-WW-33

 

Action: Investigate opportunities to introduce FOGO system and recycling at Council event and festival centres

 

Update: As part of the broader TCMF waste management and recycling audit, a food waste baseline and recycling audit was completed to understand the volumes of food waste and recycling generated at TCMF.

 

Status: Action completed

 

—

 

Action Code: WE-WW-34

 

Action: Support appropriate waste sustainability community events

 

Update: Overall community engagement occurred at the TCMF, 2 new residents’ events, 4 adult focused sustainability sessions and partnered with the Library as part of Adult Learns Week.

 

Preparations for future community workshops in the next reporting period have also been completed.

 

Status: Action completed

 

—

 

Action Code: WE-WW-35

 

Action: Investigate opportunities to encourage recycling in schools and provision of education fostering recycling behaviours and knowledge

 

Update: Council provides regular education at school’s education sessions in relation to litter and litter free lunches and provides reusable car litter bags that are valuable to help retain small litter items in vehicles. 11 early childhood and primary school visits educating 254 students and 2 landfill tours with 1 school in Tamworth for 100 students.

 

Provision of mini bins for use in childcare facilities or school based settings based on numbers required and end service arrangements.

 

Grant application submission completed under the Recycling Modernisation Fund in relation to recovering industrial plastics.

 

Advocacy to remain outside of the NSW Waste Levy area was completed during the NSW EPA during the NSW Waste Levy Review Issues Paper Process.

 

Advocacy has been made through both Department of Education and Treasury NSW to improve recycling infrastructure and collection services in schools. Council does not have jurisdiction over School contracted services. This action is ongoing.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-WW-36

 

Action: Investigate establishing a Community Waste Consultative Committee

 

Update: Community engagement is to be considered via Waste Strategy implementation in FY25/26 and FY26/27.

 

Status: Overdue or not started

 

—

 

Action Code: WE-WW-39

 

Action: Where possible, ensure TRC, commercial and residential OCC (cardboard) is diverted from landfill in Tamworth LGA

 

Update: Council has a contract in place for recovery of cardboard within the council region

 

Status: Action completed

 

—

 

Action Code: WE-WW-40

 

Action: Continue to develop and implement community and internal focused education

initiatives around waste and recycling, including waste separation.

 

Update: Ongoing Bin tagging program is direct engagement with residents about the recycling in their bins. Overall during the year, there were 12,655 properties who had their bins tagged during the 3 Phases of the program across the region:

 

– Blue tag – brilliant recyclers – 11,058 (87%)

– Orange tag – ok but some things need attention – bin serviced – 1,057 (8%) mostly single offences.

– Red tag – bin rejected for attention due to major contamination and then will be serviced – 540 (4%) mostly single offences.

 

Contamination reduction overall improved on average 33.5% of the tagged properties.

 

Overall the following items have been diverted from landfill through various programs or onsite diversion:

 

– Kerbside & rural recycling 3,275.16 ton (light loose material)

– Cardboard – 4,101.46 ton (heavy baled material)

– Metal recycling – 1,646.58 ton (heavy baled material)

– Tyres 104.84 ton

– Mattresses – 132.02 ton

– Green waste to Renew organics for processing – 8,223.43 ton

– Mulch/Compost sales – 2,688.94 ton (material available to TRC)

– E-waste – 54.76 ton

– Approved reuse material – 8,093 ton Clean concrete & brick –

6,194.36 ton

– drum MUSTER containers – (11,538) 3.36 ton

 

Attended 3 requests for community education with the Tamworth Town and Country Club, Tamworth Cottage Gardeners Group and Residents from the Easy Living Village.

 

Council facilitated Clean up Australia for registered sites, under took Sustainability Activations during the Tamworth Country Music Festival, was available in the Tamworth Library for 2 sessions during National Recycling Week and hosted 2 Art Kintsugi Workshops during Adult Learners week that was focused on a traditional Japanese reuse of damaged ceramics and keeping them out of landfill.

 

Annual Household Chemical Collection campaign was scheduled to be held in March 2025 and Cleanaway had been engaged by NIRW to provide the collection services to the Councils in the New England and North Waste Region. However there was a fire at the St Marys this did not proceed due to the engaged contractor for the region through NIRW, Cleanaway

 

Advocated for local pharmacies and pharmaceutical chains to participate in the pharmacycle program, this was positively received by Sigma Health Care and Goodprice Pharmacy.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: WE-LC-1

 

Action: Incorporate controls in the DCP to require waste management plans to be developed

and implemented at industrial and commercial sites (including construction and operation) – Templates will be provided

 

Update: Essential requirements for lodging Resource Waste Management Plans at the various stages of development to address waste streams throughout the construction process and ongoing operational phase were added into the DCP. These amendments facilitate review by the Waste and Resource Recovery Manager to prevent potential issues and understand possible volumes of material coming to waste management facilities and direct resource recovery opportunities that should be undertaken.

 

Status: Action completed

 

—

 

Action Code: WE-LC-3

 

Action: Incorporate controls in the DCP to require decommissioning plans for relevant nonstate significant renewable energy projects

 

Update: The DCP was updated to include a requirement to prepare a decommissioning plan for managing waste materials at the end of the project life.

 

Status: Action completed

 

—

 

Action Code: WE-OGM-1

 

Action: Investigate implementing “review printing release function” on all council printers to reduce paper waste

 

Update: This change will be tested in the 25/26FY, and where successful, will be implemented as a staged approach across Council printers.

 

Status: Overdue or not started

 

—

 

Action Code: WE-LC-2

 

Action: Incorporate a 2 yr. review requirement within the compliance checklist of

selected facilities. Intent of this is to identify required improvements to waste management plan process.

 

Update: Action no longer relevant.

 

Status: Overdue or not started

 

—

 

Action Code: WE-RS-1

 

Action: Update Council’s PMF project brief to detail the reuse of recovered materials in

Council projects – implemented through updates to the PMF and sustainable procurement (under Part 4 & Part 5 of EP & A Act). All Council tenders must include specifications around recycled, reuse and sustainably sourced material

 

Update: Updates have occurred for the PMF Manual and PLM (Project Lifecycle Management).

 

Section 1.4.14 of the PMF Manual discusses the obligations to consider whether goals can be achieved by utilising existing resources or more sustainable practices.

 

Status: Action Completed

 

—

 

Action Code: WE-RS-2

 

Action: Add a step into the PMF to conduct a lifecycle analysis where appropriate – i.e., focus on construction projects to determine how to reuse materials, with lower environmental impact

 

Update: Updates have occurred for the PMF Manual and PLM (Project Lifecycle Management).

 

This includes Section 2.3.12 of the PMF Manual discusses the obligations to consider lifecycle analysis for the project (asset) and includes reference to the Ellen Macarthur Circularity Tool.

 

Status: Action Completed

 

—

 

Action Code: WE-RS-3

 

Action: Add a sustainability section in the PMF (project plan) that requires the consideration of sustainability including the development of a waste management plan for Council projects.

 

Update: Updates have occurred for the PMF Manual and PLM (Project Lifecycle Management).

 

This includes Section 2.3.12 of the PMF discusses the obligations to consult Council’s Resource Recovery Register to determine the availability of surplus materials for use on the project, and to manage waste and surplus material disposal on project completion.

 

Status: Action Completed

 

—

 

Action Code: WE-OGM-2

 

Action: Identify waste sustainability opportunities as part of the new building and refit process

 

Update: This work will fall under the PMF and as a result these considerations will be made.

 

Status: Action Completed

 

Circular Economy Actions

 

Action Code: CE-WW-1, CE-WW-10

 

Action: Investigate establishing reuse & repair centres for repurposing and rehoming used products

 

Investigate developing a tool library

 

Update: Council has investigated options to establish a reuse & repair centre that could also encompass hosting a tool or library of things. This follows the decommissioning of the Small Materials Recovery Facility at the Tamworth Waste Management Centre, review of operational needs, site access and vehicle interaction paths to ascertain the most appropriate location for the site.

 

A Draft Expression of Interest document has been compiled. An expression of interest process will be undertaken in 2025/2026

 

Additionally discussions with the Library around hosting a tool library have occurred. Space required to accommodate the lendable resources is not currently available. Partnership and collaboration with the library could still be possible through utilisation of their catalogue system.

 

Council also partnered with Muswellbrook and Upper Hunter Council’s in a grant application to establish a mobile repair centre/vehicle for household items. TRC could not seek funding on its own because we are not in the levy paying area. However that application was unsuccessful.

 

Status: Both Completed for 24/25 FY but ongoing

 

—

 

Action Code: CE-WW-2

 

Action: Develop a community engagement strategy for education on reducing items sent to landfill through repair, reuse and resale

 

Update: A complete engagement strategy in relation to reuse, repair and resale will be completed should a reuse and repair facility be established. However other community engagement methods have been implemented to achieve a similar outcome, such as:

 

  • undertaking promotion encouraging residents and visitors to support local op shops by buying second hand and created the Op Shop Guide for our region.

 

  • Council hosted a Give a Sheet for the Planet collection event in September 2024 and diverted 1 ton of sheets and bed linens to Blocktexx for recycling and half a ton of towels that were distribute to local vets for reuse in their practices at no cost. Another event is scheduled for 20 September 2025.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CE-WW-3

 

Action: Develop an education campaign on circular economy for schools and the general community

 

Update: Community education program around sustainability education in resource recovery has been implemented, feedback continues to be requested in order to update resources to ensure they meet current community needs. Opportunity to extend to include more of a circular economy focus is being discussed with the locals’ principles network.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CE-WW-4

 

Action: Run internal education campaign on utilising digital substitutes for paper – for examples QR codes at events, digital business cards and minimising printing of paper

 

Update: Internal campaign not prioritised. However QR codes have been used in advertising, potential to look at in next strategy where additional focus is needed.

 

Status: Overdue or not started

 

—

 

Action Code: CE-WW-5

 

Action: Promote and develop sustainable procurement practices that contribute to a circular economy and encourage innovation in procurement processes

 

Update: Procurement policy already updated. Appropriate wording included in updated procurement procedure. Encourage additional focus to be placed on further refining this, including working with Projects team and Environment Team to improve functionality of the ‘resource recovery spreadsheet’

 

Status: Action completed

 

—

 

Action Code: CE-WW-5

 

Action: Promote and develop sustainable procurement practices that contribute to a circular economy and encourage innovation in procurement processes

 

Update: Procurement policy already updated. Appropriate wording included in updated procurement procedure. Encourage additional focus to be placed on further refining this, including working with Projects team and Environment Team to improve functionality of the ‘resource recovery spreadsheet’

 

Status: Action completed

 

—

 

Action Code: CE-OGM-1

 

Action: Update and maintain Council’s procurement policy and procedure to ensure 85% of Council construction projects incorporate reuse of materials by 2026

 

Update: The procurement procedure was updated to include Council capital works projects include 30% recycled and or resource recovered materials where viable. This is also included in the PMF.

 

Status: Action completed

 

—

 

Action Code: CE-WW-6

 

Action: Work with NIRW to investigate opportunities to consult and collaborate with the broader region to understand the shared challenges and solutions around waste and circular economy. This includes using the NIRW regional materials flow analysis report 2019-2021 to identify opportunities for micro factories with our LGA; and regional processing collaborations.

 

Update: Completed, this led to identification of potential streams around industrial hard plastics and solar panels.

 

Status: Action completed

 

—

 

Action Code: CE-WW-7, CE-WW-8

 

Action: Engage with industry and businesses around circular economy opportunities

 

Review opportunities to link waste producers with businesses that require waste inputs

 

Update: Investigated a number of opportunities including meeting with Brisbane City Council to understand how they are using the Aspire platform to encourage businesses and industry to develop a circular economy. Additionally met with Finao Materials Sharing Platform developers and received a free trial. This platform is used by Sydney Water.

 

Another future opportunity maybe through the CE data Portal developed by Peclet Software for Albury Council that was created through a $1M grant from Transport for NSW.

 

Opportunity to keep investigating this for our community to substantially increase waste diversion rates

 

Status: Both Completed for 24/25 FY but ongoing

 

—

 

Action Code: CE-WW-9

 

Action: Develop a Circular Economy Road Map for and with our local community

 

Update: Not possible at this point in time due to resourcing. Potential to include in Waste Strategy.

 

Status: Overdue or not started

 

—

 

Action Code: CE-WW-11

 

Action: Determine the internal process to increase circularity within TRC. Where viable, lead the implementation of this process

 

Update: An internal spreadsheet was developed with Projects Teams, Water & Waste directorate, and Projects and Construction teams, Regional Services to introduce the concept of internal circular economy process. Some further work is required to create supporting procedure documents, and automation

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CE-LC-1

 

Action: Conduct an assessment to identify employment and economic growth opportunities linked to sustainability and circular economy as part of the towns and villages resilience plans

 

Update: The regional community Resilience Plans have been put on hold until the implementation of the Tamworth Regional Precinct Committee. Council passed a resolution to implement the Committees in April 2025, adopted Terms of Reference August 2025 with Expressions of Interest currently called for committee members, closing late October 2025. As the Precinct Committees will deal with strategic items relative to the regional communities’ future growth and sustainability, it is considered that the committee meetings will be a source of collating the required statistical data and community engagement towards the development of community resilience plans.

 

Status: Completed for 24/25 FY but ongoing

 

Energy Actions

 

Action Code: CE-All-1, E-GP-3

 

Action: Undertake energy audit of all key Operational buildings and key sites (dams, pump stations, landfills etc.) with a load greater than 50 MWh/yr to make recommendations for efficiency measures

 

Conduct audit of commercial properties to understand opportunities to reduce energy cost

 

Update: Energy audits for 20 of Councils highest energy users has been completed. This was conducted in two phases, with audits conducted of 7 sites eligible for the Community Energy Upgrade Fund (CEUF) April 2025. This information was used to submit an application for the CEUF June 2025. The remaining 13 sites were audited June 2025. Recommendations are currently under consideration by the consultant, with the final report expected to be received by Council November 2025. Only commercial facilities classified within 20 of Councils highest energy users were included.

 

Status: Both Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-GP-1

 

Action: Investigate installing a solar farm at the airport to enable airport to be self sufficient

 

Update: A sustainability audit of the airport training facility was completed to inform grant applications made by the airport. As part of this audit, a solar farm was considered by the consultant, but not recommended at that point in time.

 

Status: Action Completed

 

—

 

Action Code: E-GP-2

 

Action: Investigate conducting assessment on townhall and TRECC air-

conditioning system to reduce energy, chemical and water use (12 systems in town hall)

 

Update: Assessment completed by consultant to support the Energy audit process. These reports were used to support the CEUF grant application which was focused on upgrading HAVAC systems at end of life for facilities selected by ELT, awaiting outcome of CEUF grant application.

 

Status: Action Completed

 

—

 

Action Code: E-GP-4

 

Action: Conduct solar demand analysis of AELEC including determining capacity of roof, and aesthetic options – System big enough to support their base load

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-GP-4

 

Action: Conduct solar demand analysis of AELEC including determining capacity of roof, and aesthetic options – System big enough to support their base load

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-LC-1

 

Action: Investigation whether to update the DCP to include energy efficient development controls for residential, commercial and industrial development. This should include whether new gas connections should continue to be permitted or not

 

Update: The DCP was also updated to include reference to provisions for electric vehicle chargers in accordance with the National Construction Code (Australian Building Codes Board). It also references the Sustainable Buildings SEPP, BASIX and Section J of National Construction Code The updated DCP was adopted July 2024.

 

Status: Action Completed

 

—

 

Action Code: E-LC-2

 

Action: Investigate whether to insert a control in the DCP to encourage the use of sustainable design and the use of sustainable building materials to reduce energy use

 

Update: This action was investigated, but no longer required due to the introduction and enforcement of the Sustainable Building SEPP which focuses on building materials.

 

Status: Action Completed

 

—

 

Action Code: E-RS-1

 

Action: Review the current maintenance contract with asset owners in order to Implement and perform regular solar system maintenance program according to manufacturer’s guidelines on all Council owned Solar PV systems

 

Update: The Maintenance contract has been reviewed, reissued and is being implemented.

 

Status: Action Completed

 

—

 

Action Code: E-WW-1

 

Action: Review Energy audit 2020 to determine if there is a feasible business case to transition to solar and LED lighting (such as on airport roof, and hangers)

 

Update: Completed as part of the preparation of the Energy audit

 

Status: Action Completed

 

—

 

Action Code: E-WW-2

 

Action: Investigate and identify grant opportunities to facilitate the transition to solar and LED lighting at key Council owned building locations (including the airport)

 

Update: This action was included as part of the energy audit, with solar and LED included in the CEUF draft grant application.

 

Status: Action Completed

 

—

 

Action Code: E-WW-3

 

Action: Install a gas fired generated for reuse of gas at Forest Roads Landfill

 

Update: Contract to implement power generation was entered 2021. Unfortunately, gas generation has not increased as expected and therefore the power generation is not yet viable for the contractor to implement. Continued negotiations with contractor are underway.

 

Status: Overdue or not started

 

—

 

Action Code: E-WW-4

 

Action: Develop and implement community and business education initiatives addressing energy efficiency, including guidance on how to reduce energy consumption (such as face to face sessions, online videos, pdf downloads, communication campaigns, innovation workshops)

 

Update: Energy education initiatives developed and implemented include running sessions for primary school students as part as the anniversary of City of Lights at the museum, providing advice to community members as part of adult learner’s week, school vacation program, TCMF, and answering questions around energy efficiency at Home Sweet Home – energy efficiency 101 presented by Landcare.

 

Status: Action Completed

 

—

 

Action Code: E-WW-5

 

Action: Develop energy efficiency program at workplace for staff

 

Update: Recommendations for this will come from the energy audit process.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-6

 

Action: Investigate installing interval meters for more granular measurement of electricity usage

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-WW-7

 

Action: Investigate potential for installing sophisticated BMS for asset performance monitoring and optimisation – especially when conducted fit outs or constructing new buildings

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-WW-8

 

Action: Investigate transitioning to an agreement that enables Council to increase renewable energy use from the current 20% composition of renewable (Small scale sites 1 July; large scale sites 1 Jan 2023) or installing behind the metre solar

 

Update: This may be considered as one of the preliminary options during the energy contract discussions currently underway.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-9

 

Action: Undertake lighting audit and upgrade to LEDs and smart lighting according to the audit findings

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-10

 

Action: Address Power Factor Correction in accordance with energy audit findings

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-WW-11

 

Action: Perform solar PV feasibility study for Council facilities and sites based on energy audits guidance

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Action Completed

 

—

 

Action Code: E-WW-12

 

Action: Investigate if TRC should perform feasibility study for micro hydro power technology for water pipelines

 

Update: Investigation previously completed for Dungowan Pipeline and reviewed as part of new Dungowan Pipeline Project. Current technology not suited to Council’s existing assets. Should be considered on a case by case basis for any future large diameter pipeline projects or as technology changes.

 

Status: Action Completed

 

—

 

Action Code: E-WW-13

 

Action: Based on energy audit outcome, identify suitable energy monitoring system (Smart meters, etc.)

 

Update: Included as part of the energy audit process completed June 2025, awaiting Report.

 

Council has 13 locations where solar has been installed, at the moment Council is only able to monitor 10 of these sites. 3 Watt Watchers are currently being installed at:

 

  • Barraba WTP
  • Tamworth Airport, and
  • SMRF.

 

These Watt Watchers will send solar data to Councils Energy management platform E21.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-14

 

Action: Investigate opportunities to implement distributed energy systems and energy storage solutions to increase council’s uptake of renewable energy (solar, wind, hydro, geothermal, biomass, mechanical etc.)

 

Update: Included as part of the energy audit process completed June 2025, awaiting report. Solar was prioritised.

 

Status: Action Completed

 

—

 

Action Code: E-WW-15

 

Action: Support appropriate sustainability community events relating to Energy

 

Update: Key annual events include TCMF, Anniversary of ‘City of Lights’ and Earth Hour. Additional event is supporting the EV day to be held by DCCEEW October 2025.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-16

 

Action: Energy efficient options considered in relation to light and pump upgrades

 

Update: Included as part of the energy audit process completed June 2025, awaiting report.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-17

 

Action: Investigate how Council can use LGC’s under large scale renewable energy target scheme

 

Update: Under current supply agreements Council is not able to access LGC’s

 

Status: Action Completed

 

Comment: Does our ability to access LGC’s have the potential to change under currently ongoing energy contract discussions (as per E-WW-8)?

 

—

 

Action Code: E-WW-18

 

Action: Conduct scope 2 carbon emissions tracking using energy data

 

Update: Funding obtained for 23/24FY, conducted in 23/24 FY, using 22/23 FY data – ongoing from 24/25FY to allow tracking of data.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-19

 

Action: Investigate opportunities for establishing partnerships to advance the transition to best practice alternative energy and storage solutions within Tamworth LGA

 

Update: A number of proposals have been provided and considered through state government and the Economic Development Division, this is an ongoing process.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-20

 

Action: Consider identifying which Council buildings may be able to comply with minimum 5* Nabers rating by 2026, and work towards achieving this.

 

Update: Initially included as part of the energy audit scope. However due to a number of reasons it wasn’t possible to include it within the final project.

 

Status: Completed for 24/25 FY, but ongoing

 

—

 

Action Code: E-WW-21

 

Action: Using data from the energy audit and additional assessments, conduct a risk based options analysis to identify how to best improve energy efficiency across the Organisation and establish a project plan for implementing these energy efficiency recommendations.

 

Update: Once energy audit report is received, the risk based options analysis is proposed to occur before funds are obtained and directed into improvements.

 

Status: Overdue or not started

 

—

 

Action Code: E-WW-22

 

Action: Implement energy efficiency recommendations in accordance with audit and project plan

 

Update: Although report won’t be received end of 2025, some improvements have occurred or are underway, such as transition to LED’s, solar monitoring at un-monitored solar sites, and installation of heat pumps program in eligible council

 

Status: Completed for 24/25 FY, but ongoing

 

Comment: Is this an ETA for the energy audit process report. My interest here comes from the reliance on this report to address various other actions within this section of the strategy?

 

—

 

Action Code: E-WW-23

 

Action: Determine whether an Energy Strategy or Energy Framework should be developed. Where it should, determine what would this look like and gain by in to implement this change

 

Update: No action on this issue

 

Status: Overdue or not started

 

—

 

Action Code: E-RS-2

 

Action: Changing globes in Street lighting over to LED

 

Update: Completed 23/24 FY

 

Status: Action Completed

 

Natural Environment Actions

 

Action Code: NE-All-1

 

Action: Investigate using additional recycled water to improve landscaping at key Council locations where appropriate

 

Update: Risk assessments identified effluent as not suitable for landscape use without further treatment. AELEC Recycled Water scheme audit completed and water use optimised in AELEC/Sports precinct.

 

Status: Action Completed

 

—

 

Action Code: NE-LC-1

 

Action: Complete update of MiMaps to reflect high ecological significant vegetation

 

Update: Biodiversity Mimaps draft layers have been developed. This is in the process of being tested, updated, refined and finalised before training is rolled out to relevant staff.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-2

 

Action: Review and update the DCP and or the subdivision guidelines to ensure they consider and minimise negative environmental impacts during subdivision stage. This includes protecting and maintaining biodiversity & biodiversity corridors, as well as the integration of passive solar design, sustainable drainage systems and water use at subdivision stage where viable

 

Update: The DCP was updated July 2024 to include a requirement for proponents to describe and map the existing environmental values and address how the subdivision addressees the hierarchy of environmental impact mitigation.

 

Biodiversity Mimaps draft layer includes where biodiversity corridors should be located.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-3

 

Action: Identify where MiMaps requires updating to reflect high ecological significant vegetation and provide this information to the environmental engineering team

 

Update: Identification undertaken, new Mimaps layers are in draft form (draft spatial layers). In order to identify where Mimaps required updating, this project needed to be properly scoped, feedback was obtained from stakeholders, and fieldwork was required to be carried out over multiple seasons.

 

Status: Action Completed

 

—

 

Action Code: NE-LC-4

 

Action: Using the updated biodiversity map, identify, develop and maintain wildlife corridors

 

Update: The draft spatial layers include potential corridors. Planners will be trained on how to interpret the updated mi maps layers before they can guide proponents to implement recommendations from the mapping.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-5

 

Action: Update the DCP and LEP to protect high ecological significant biodiversity community and take the required steps to make these changes

 

Update: DCP was updated July 2024 to reflect requirements of the biodiversity conservation act, and to request an environmental values locality map identifying vegetation and flora when undertaking subdivision.

 

Changes to the LEP may be made following the finalisation of updates to the biodiversity mipmaps layers

 

Status: Completed for 24/25 FY LEP part ongoing

 

—

 

Action Code: NE-LC-6

 

Action: Update the LEP to increase protection of waterways and incorporate relevant sustainability measures

 

Update: The formulation of the Tamworth Regional Rural Lands Strategy includes consideration of these matters. The finalisation and endorsement of the strategy by DPHI will establish a basis for amendments to the LEP

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-7

 

Action: Update the DCP, to address the urban heat island effect

 

Update: The DCP was updated to include greening cooling mechanisms and non-greening mechanisms from the Tamworth urban heat island report. These changes were adopted within the DCP July 2024.

 

Status: Action Completed

 

—

 

Action Code: NE-WW-1

 

Action: Review current practice, and where appropriate develop and implement a strategic works program for the management of Council owned natural areas of Tamworth LGA (including biodiversity, bushfire hazard reduction and pest plant management

 

Update: Finalisation of biodiversity base project will allow planning. Comments regarding bushfire management included below.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-1

 

Action: Design and implement conservation management plans for council-controlled land and reserves with biodiversity value

 

Update: No progress. Completed biodiversity baseline information will be able to be used to scope and plan future planning and projects.

 

Status: Overdue or not started

 

—

 

Action Code: NE-LC-2

 

Action: Update priority areas of the Tamworth Regional biodiversity study 2007 by 25/26. This document will form the basis for relevant environmental planning and land management decisions

 

Update: The draft biodiversity baseline report update has been received by TRC. Work continues with TRC’s GIS team, the biodiversity consultant and planning teams to ensure key flora and fauna from these reports are reflected in the updated draft mi map layers.

 

Status: Action Completed

 

—

 

Action Code: NE-LC-3

 

Action: Collaborate with researchers including UoN and UNE within their fields of expertise including natural environment, biodiversity, circular economy, resilience, mitigation and adaptation, water, waste and energy

 

Update: Collaboration with universities in relation to water saving initiatives for example evaporative cooler water use study. Engagement and collaboration with university of Newcastle regarding emergency environmental chemical such as PFAS

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-LC-4

 

Action: Develop an environmental checklist to be used by developers where onus is on the developer to provide evidence, they are firstly avoiding impacts to the natural environment including high ecological significant communities

 

Update: Action is reliant on baseline study update and associated mapping which is currently in draft form. Proposed that this action is no longer needed.

 

Status: Overdue or not started

 

Comment: Noting that it’s proposed that this action is no longer needed, what’s the basis behind that suggestion?

 

—

 

Action Code: NE-WW-2

 

Action: Implement the Tamworth Bushfire Risk Mitigation Plan and investigate improvements to the plan

 

Update: In progress – initial review of management plan, associated asset owner allocation has been completed. Ongoing implementation required.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-WW-3

 

Action: Investigate monitoring ambient water quality to identify risks to ecosystem integrity (GW, linked to license conditions) and the source of contaminants

 

Update: Completed on case by case basis for project environmental impact assessment and associated delivery. Stormwater management plan includes water quality monitoring recommendations.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-WW-4

 

Action: Investigate conducting additional air quality monitoring at key location

 

Update: High risk sites such as Forest Road Landfill have had air quality monitoring undertaken

 

Status: Action Completed

 

—

 

Action Code: NE-WW-5

 

Action: Collaborate with researchers and key groups, to continue to provide support for local sustainable agricultural practices through communication, workshops and local exemplars

 

Update: Partnered with Renew Organics and Landcare to achieve this. Other events have been organised by Landcare and Local Lands Services separate to Council.

 

Status: Action Completed

 

—

 

Action Code: NE-WW-6

 

Action: Identify critical locations to focus the investigation and implementation of carbon credits and biodiversity offsets (stewardship agreement)

 

Update: Specific Council land areas identified within the Biodiversity study include Bolton’s Creek land management area, Forest Road Landfill buffer area. Future investigation may occur at Dungowan Dam.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-WW-7

 

Action: Identify critical locations to focus the investigation and implementation of carbon credits and biodiversity offsets (stewardship agreement)

 

Update: Specific Council land areas identified within the Biodiversity study include Bolton’s Creek land management area, Forest Road Landfill buffer area. Future investigation may occur at Dungowan Dam.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-WW-7

 

Action: Identify critical locations to focus the investigation and implementation of carbon credits and biodiversity offsets (stewardship agreement)

 

Update: Specific Council land areas identified within the Biodiversity study include Bolton’s Creek land management area, Forest Road Landfill buffer area. Future investigation may occur at Dungowan Dam.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-WW-8

 

Action: Re-naturalise degraded waterways and undertake Peel River Environmental Improvement Works within Tamworth LGA

 

Update: Council’s Peel River Environmental Improvements project commenced in 2023. In 2025, environmental initiatives associated with this project were aligned with the Yarriin: Culture, Fish and Flows – Calala (Paradise Weir) Case Study Project.

 

Status: Action Completed

 

Comment: The recent reports that have gone to Council outlined ongoing actions and grants applied for to continue planned actions, the Yarriin: Culture, Fish and Flows – Calala (Paradise Weir) Case Study Project is likewise seeking funding to implement, and while this section of the Peel is highly visible it’s only one section of waterway within the LGA. With this considered, surely a more appropriate status for this action is “Completed for 24/25 FY but ongoing” as opposed to being marked as completed?

 

—

 

Action Code: NE-WW-9

 

Action: Consider how to improve the retention of existing native trees on private property, as well how to improve the number & quality of native trees used to replace trees removed on private property

 

Update: Review completed, methods to achieve this were proposed for inclusion within the 2024 DCP update.

 

Status: Action Completed

 

—

 

Action Code: NE-WWLCRS-1

 

Action: Work with Aboriginal groups to improve management of Council owned land (Joint Management Agreements)

 

Update: Council is working in consultation with the Tamworth Local Aboriginal Lands Council to manage numerous sites across the LGA. Including skywalk.

 

Status: Completed for 24/25FY, ongoing

 

—

 

Action Code: NE-WWLCRS-1

 

Action: Explore the possibility of developing a holistic management plan for land management within the Victoria Park Precinct. This will be a pilot project. Components for consideration in this pilot project could include traditional landowner management practices, eco-tourism and visitor

economy principles.

 

Update: This initiative is still in a conceptual phase. The Mara Ngala agreement between TRC and the TACCO may provide a platform to progress the plan.

 

Status: Overdue or not started

 

—

 

Action Code: NE-RS-1

 

Action: Review the street tree management plan and where necessary update to include species tolerant to future climate projections

 

Update: Council has continued its strategy to Green the Region through the planting of more than 1000 trees in Spring, Autumn and Winter

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-RS-2

 

Action: Increase biodiversity through planting more local trees and shrubs in parkland

 

Update: Council has continued its strategy to Green the Region through the planting of more than 1000 trees in Spring, Autumn and Winter.

 

Status: Completed for 24/25 FY but ongoing

 

Comment: The achievements of implementing the Urban Street Tree Management Plan should be commended, can I suggest we put a great emphasis on planting of native and regionally appropriate shrubbery and ground cover in future years as well?

 

—

 

Action Code: NE-RS-3

 

Action: Support community groups to use more of TRC’s Community land to green the region/plant more trees in line with the Urban Street Tree Management Plan

 

Update: Council continues to support community groups with planting tree across open space with the provision of plant stock, and other essential planting requirements.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-RS-4

 

Action: Support community groups in the establishment and maintenance of community gardens in accordance with the relevant TRC policy

 

Update: Developed a draft policy, set to be adopted in the 2025 policy review

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-RS-5

 

Action: Aim to Improve existing stormwater quality through implementing appropriate solutions

 

Update: Continually ongoing. This is essentially a design principle so it will be applied across all designs.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: NE-RSLC-1

 

Action: Consider including stormwater quality targets in the DCP when undertaking subdivision

 

Update: Considered during DCP update, due to a number of reasons a requirement to identify environmental values during subdivision was included

 

Status: Action Completed

 

Transport and Mobility Actions

 

Action Code: T-WWRS-1

 

Action: Develop and implement a high-level EV Roadmap/ Strategy. This document will detail how to connect Tamworth LGA to the wider EV network and how to reduce carbon emissions from TRC and private vehicles.

 

Update: The Electric Vehicle Strategy and Charging on Public Land Policy was adopted by Council March 2024.

 

Status: Action Completed

 

—

 

Action Code: T-WWRS-2

 

Action: Investigate EV charging requirements for residential/commercial/ industrial carparking developments and how this can be integrated into the DCP

 

Update: Investigation completed 2024 see earlier comments.

 

Status: Action Completed

 

—

 

Action Code: T-WWRS-3, T-WWRS-5

 

Action: Investigate options for implementing charging infrastructure for future uptake of electric vehicles

 

Update: This led to the development and adoption of the Electric Vehicle Strategy and Charging on Public Land Policy was adopted by Council March 2024.

 

Internal work by plant and fleet includes installation of two charging stations at depot, one fast charger at stores, and one trickle charger (15amp plug) at workshop.

 

Status: Both Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-WW-1

 

Action: As part of the EV strategy, investigate viability for council to transition all new purchase of plant (including lawn mowers, loaders etc) and commercial vehicles to EV (or hybrid if electric not fit for purpose/available)

 

Update: A Transition strategy is currently being implemented. All the pool garden care equipment has been transitioned to electric, (mowers, whipper snippers, blowers), zero turn electric mower is currently being trialled (batteries are good, issue with blade drive system). Benefits of doing this include staff no longer have to fill up fuel containers and store onsite, reduced exposure to volatiles, risk of fire. Electric alternate have less frequent maintenance requirements, and don’t have the cost of fuel, however they do have the cost of battery storage containers. Hybrid EV’s have been added to the leaseback list with EV’s being investigated, however it is not currently feasible to transition all vehicles to EV.

 

Status: Action Completed

 

—

 

Action Code: T-WWRS-6

 

Action: Investigate existing load capacity and demand constraints of electrical infrastructure in order to prepare Tamworth LGA for the electrification of vehicles

 

Update: Investigation completed. Council regularly liaises with Essential Energy.

 

Status: Action Completed

 

—

 

Action Code: T-WWRS-7

 

Action: Investigate the opportunity to develop public private partnerships (PPP) to roll out EV charging stations in align with EV Roadmap/Strategy

 

Update: Investigation completed, Charging on public land policy and EV Strategy guide the installation of EV chargers by private entities.

 

Status: Action Completed

 

—

 

Action Code: T-LC-1

 

Action: Investigate opportunities for incorporating integrated transport planning when assessing development applications and master plans

 

Update: Development and Strategy Teams are working together to consider Council’s transport plans quite closely in relation to major DAs and Master plans. Action has been extended into the 25/26 FY as well.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-1

 

Action: Investigate implementing a 1 year trial of e-scooters within the Tamworth LG

 

Update: Investigated and deemed not feasible at the time (awaiting outcome of trials in other towns/cities). Given issues with e-scooters might be some time before a trial is adopted in Tamworth

 

Status: Action Completed

 

—

 

Action Code: T-RS-2

 

Action: Assess business case for providing end- of-trip facilities at all TRC depots and offices for staff

 

Update: End of trip facilities located at Lockheed st depot and Flynn street depot including both male and female toilets and showers. Due to potential temporary nature of current layout, business case not assessed for other sites

 

Status: Action Completed

 

—

 

Action Code: T-RS-3

 

Action: Consider adding electric vehicles as an option to the approved leaseback list

 

Update: A number of hybrids have replaced the ICE equivalent, this includes Toyota Prado mild hybrid, Toyota SR5 mild hybrid, Hyundai SANTA FE mild hybrid, Mitsubishi eclipse plug in hybrid, Camry hybrid, Rav4 hybrid. Adding electric vehicles to the list is under consideration having consulted with other councils to understand opportunities and barriers before adding to the list, this may be considered in the 25/26 FY where a reasonable price can be obtained.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-4

 

Action: Investigate alternative parking arrangements to reduce congestion in Tamworth LGA, such as park and ride or similar systems

 

Update: Continually ongoing. New carparking strategy adopted.

 

Looking at how we can encourage mode shift to decrease the demand on our existing and future parking network. Mode shift requires quality infrastructure, of which vast majority is unfunded so will be an ongoing task.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-5

 

Action: Under the Transport Master Plan (Tamworth Integrated Transport Plan), consider how to reduce the number of private vehicle trips, provide better access to active transport options and improve public transport

 

Update: As per T-RS-4, this is primarily achieved through infrastructure which will be an ongoing task as majority of it is unfunded.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-6

 

Action: Implement actions under the Active Transport strategy

 

Update: Ongoing – we have completed a number of items within the Active Transport Strategy. We are aiming to update our Active Transport Strategy in the coming 12 months

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-7

 

Action: Under the Active Transport Strategy, risk assessments are undertaken to assess the safety and connectiveness of bike routes to identify and mitigate hazards to encourage active transport

 

Update: Ongoing – All identified, new shared path routes are based on many factors including safety. Safety in design principles are at the core of the design process and during delivery of the project.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RS-8

 

Action: Investigate additional parking options on the fringe of the CBD options to reduce congestion in CBD

 

Update: Ongoing – There are a number of existing “fringe” CBD car parks including Griffin Ave, Solander Drive and Gipps Street. The latter two have poor utilisation, however efforts are being made to encourage all-day parkers to choose these as viable options.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RSLC-1

 

Action: Implement actions under the CBD Movement Plan (this plan doesn’t exist) and CDB Parking Strategy (Tamworth Regional Parking Strategy) including investigating use of smart phone applications for parking and smart signs

 

Update: Ongoing – actions identified within the Tamworth Regional Parking Strategy will take some time to implement (and fund). However good progress is being made (e.g. changes to parking time restricted areas, metered/free areas, new parking meters, LPRC etc.)

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-RSLC-2

 

Action: Under the Bridge Street Precinct Transport Study look to improve the connection between the Airport and CBD

 

Update: Ongoing but not the highest priority at the moment. Will be difficult to improve, however improved public transport options should be investigated.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-WWRS-4

 

Action: Research and apply for appropriate grants in align with other Transport and Mobility strategies

 

Update: Ongoing – We are continually applying for active transport funding across our LGA.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: T-WWRS-8

 

Action: Engage with large scale employers to develop and implement sustainable workplace travel plans

 

Update: Have not commenced this directly, however we are ensuring that we efficiently connect large places of employment with our residential areas by improving active transport infrastructure. Examples include the Calala to CBD Shared Path (via King George Ave) and the TGGP / Airport to Tamworth Golf Course Shared Path – both of which are in the design phase.

 

Status: Overdue or not started

 

Sustainable Governance Actions

 

Action Code: SG-WW-1

 

Action: Develop a sustainability panel which details preferred companies to formulate specifications and companies that can provide sustainability related services

 

Update: No action to date.

 

Status: Overdue or not started

 

—

 

Action Code: SG-WW-2

 

Action: Investigate the feasibility of re- establishing the Sustainability expo

 

Update: Established a working group with representatives from Northern Inland Regional Waste, Rotary first light, Sustainable Northwest and Council. 8 meetings were held. Unfortunately the committee decided not to submit a sponsorship proposal.

 

Status: Action completed

 

—

 

Action Code: SG-WW-3

 

Action: Undertake a gap assessment of Council buildings to understand how to make our buildings carbon neutral

 

Update: Partially completed for select buildings around Scope 2 emissions as part of the Energy Audit. Further action is required to complete this for all buildings and scopes.

 

Status: On hold

 

—

 

Action Code: SG-WW-4

 

Action: Investigate opportunity to employ a grants assistance officer to assist Council staff prepare and obtain grants for sustainability and related initiatives

 

Update: Grants officer has been appointed.

 

Status: Action completed

 

—

 

Action Code: SG-WW-5

 

Action: Roll out Sonny sustainability curriculum to all schools within the LGA to increase sustainability uptake

 

Update: Sonny sustainability educational resources developed in accordance with NSW curriculum and distributed December 2023. Note – Engagement continues to occur with schools and the Principles network in order to inform future improvements.

 

Status: Action completed

 

—

 

Action Code: SG-WW-6

 

Action: Investigate how to communicate sustainability information to consultants to lift the standard of DA’s submitted to Council from a sustainability perspective

 

Update: Investigation completed. Outcome was to include sustainability into the DCP, and for the Sustainability Unit to be involved in the Developers meetings where relevant.

 

Status: Action completed

 

—

 

Action Code: SG-WW-7

 

Action: Investigate adoption of an Environmental Upgrade Agreement approach to support local businesses to upgrade building to improve sustainability, reduce carbon emissions and reduce water and electricity costs

 

Update: Investigation was completed in the 22/23 and 23/24FY, with the assistance of Sustainability Advantage. It was decided to prioritise Council assets at the time. Opportunity for this to be further investigated in the future.

 

Status: Action completed

 

—

 

Action Code: SG-WW-8

 

Action: Investigate how to improve engagement with the community on sustainability topics

 

Update: A review of the sustainability website was completed in the 22/23 and 23/24 FY, including a review of other council’s websites and communication methods used to effectively communicate sustainability topics to the community. Once resourcing in the communications team allow, it is recommended to implement some of these ideas. In the interim sustainability is included in the newsletter in order to improve regular engagement.

 

Status: Action completed

 

—

 

Action Code: SG-WW-9

 

Action: Develop a marketing strategy around communicating the good things community groups and businesses are doing in relation to sustainability, eco-system services and circular economy

 

Update: Currently facilitated through the local legend’s awards – sustainability category, as well as through supporting the sustainable gardens tour, and promoting businesses and individuals who use the water portal to achieve a positive outcome. Potential for further focus to be placed on this action in subsequent strategies.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-WW-10

 

Action: Develop an internal communication resource to distribute best practice ideas in relation to incorporating sustainability across our organisation

 

Update: No action on this item

 

Status: Overdue or not started

 

—

 

Action Code: SG-WW-11

 

Action: Investigate finance options to support Council upgrade its buildings to improve sustainability, reduce carbon emissions and reduce energy and water costs

 

Update: Investigation completed, the primary grant identified and applied for is the Community Energy Upgrade Fund Grant – awaiting the outcome of this grant application.

 

Status: Action completed

 

—

 

Action Code: SG-WW-12

 

Action: Review the event planning documents to incorporate sustainability within events and festivals

 

Update: Events planning documents have initially been reviewed. Feedback has been obtained from the events team. TCMF waste audit completed 24/25 FY. Action required in 25/26 FY to ensure documents are updated to reflect events team feedback and outcomes from TCMF waste audit

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-WW-13

 

Action: Investigate and where required develop a framework to set climate change adaptation in TRC’s procurement procedure.

 

Update: To be considered as part of a new strategy

 

Status: On hold

 

—

 

Action Code: SG-WW-14

 

Action: Review all policies, strategies and procedures to develop a list of recommendations specific to climate change adaptation, mitigation and sustainability opportunities. This is key to ensuring TRC meets its sustainable governance objectives of integrating a sustainable approach through the work of all directorates.

 

Update: Risk and Safety have undertaken a review of the IMS policies that looks at WHS, Environment, Quality and Risk.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-WW-15

 

Action: Work with the Risk Team to develop a process and checklist for REF

 

Update: Included in integrated management system.

 

Status: Action Completed

 

—

 

Action Code: SG-WW-16

 

Action: Work with the Risk Team to develop a process and checklist for REF

 

Update: Investigations identified this should be integrated in to the procurement

procedure rather than the REF.

 

Status: Action Completed

 

—

 

Action Code: SG-GP-1

 

Action: Identify which commercial properties to audit in terms of aircon, water use, and electrical use and understand opportunities

 

Update: Included as part of the energy audit process for aircon, and electrical usage for high energy consuming sites. Water usage review is also currently being completed by the Water Sustainability Officer.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-OGM-5

 

Action: Incorporate sustainability into the Integrated Management System – i.e., create a policy for selection of materials which specifies when to use recycled material (POEO Act)

 

Update: Under way but progress is slow.

 

Status: Overdue or not started

 

—

 

Action Code: SG-OGM-3

 

Action: Update and maintain Council’s Procurement policy and procedure to ensure it incorporates sustainable procurement (including life cycle analysis, life of asset assessment, end of use disposal, environmental impact and requires all Council tenders to include specifications around including recycled, reuse and sustainably sourced materials where possible.)

 

Update: Council’s Procurement Procedure has been updated

 

Status: Action Completed

 

—

 

Action Code: SG-LCWW-1

 

Action: During DCP and LEP reviews, consider opportunities to further incorporate

sustainability into these documents, to improve the likelihood that large scale DAs submitted to Council include acceptable sustainability outcomes

 

Update: Feedback on EIS documentation when submitted is provided as required. As part of the DCP review process improvements have been made to how waste and resource recovery, biodiversity, and related areas are integrated into the DCP inc. including a requirement to prepare a decommissioning plan for managing waste materials at the end of the project life.

 

Status: Action Completed

 

—

 

Action Code: SG-All-1

 

Action: Include Sustainability Unit within Project Control groups of all major significant construction projects or major event centre projects

 

Update: Sustainability has generally been included in project control groups of most major projects, events, and development of most master plans.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-All-2

 

Action: Update all asset management plans within the strategic alignment and climate change adaptation section to reflect sustainability

 

Update: All asset management plans updated 24/25 and all now include climate change adaptation section.

 

Status: Action Completed

 

—

 

Action Code: SG-GP-2

 

Action: Investigate how to Incentivise renewables energy, alternative fuel, alternative waste solutions and sustainability related industries coming to the Tamworth LGA emerging employment lands

 

Update: Council has engaged with private and public entities to facilitate the delivery of this action where practicable.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-LC-1

 

Action: Work with local Aboriginal community groups to develop a process to protect important Aboriginal features on Council owned land and celebrate Aboriginal heritage

 

Update: Aboriginal liaison officer position plays a large role within this action – as the role has been vacant it hasn’t been possible to effectively implement this action to date. It is currently out to recruitment. Once the role is filled this action will be reopened.

 

Status: On hold

 

—

 

Action Code: SG-All-3

 

Action: Review building and asset portfolio to identify what actions need to be taken to achieve sustainability objectives, and implement changes accordingly

 

Update: This was included as part of the Energy audit.

 

Status: Action Completed

 

—

 

Action Code: SG-All-4

 

Action: After reviewing asset portfolio, review building maintenance budgets to ensure they are adequate for proposed change

 

Update: Building special rate variation has allowed us to focus on reactive renewal, and remaining funds can be spent on solar, LED, upgrade to air-conditioning units.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-OGM-1

 

Action: Add the heading “environmental sustainability” to the Council Report

 

Update: Info Council is being updated with the most recent 365 migration, once this takes place a new template will be workshopped with managers and ELT for adoption and will contain the proposed ‘environmental Sustainability’ heading

 

Status: On hold

 

—

 

Action Code: SG-OGM-2

 

Action: Implement sustainability actions outlined within the workforce management plan. This includes incorporating sustainability within the TRC induction process.

 

Update: Sustainability has been included within the Foundations Masterclass with Quality and Environment delivered by Risk & Safety. Additionally sustainability has been included in the Employee Handbook.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-OGM-4

 

Action: Investigate providing internal training on sustainable procurement

 

Update: No action on this item as yet

 

Status: Overdue or not started

 

—

 

Action Code: SG-OGM-6

 

Action: In relation to enterprise risk and insurance associated with asset management, consider climate change

 

Update: Council participates in annual continuous improvement pathway self-audits that identifies the impacts of climate change as contributing factors that should be addressed on council assets such as playgrounds, footpaths, bridges, buildings etc. Each year actions are identified and shared with asset owners.

 

The organisational operational risk register is under development and incorporates the risks of climate change on a number of areas.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: SG-RS-1

 

Action: Insert a clause within the project brief that requires the PM to demonstrate the prioritisation of sustainable materials and design elements within their projects and consider how they can achieve a carbon neutral outcome where feasible.

 

This includes the target of incorporating 30% recycled and or resource recovered materials in Capital Works projects where feasible.

 

Update: Current action closed in 25/26 FY based on updates to the PMF Manual and PLM (Project Lifecycle Management).

 

Section 1.4.14 of the PMF Manual discusses the obligations to consider whether goals can be achieved by utilising existing resources or more sustainable practices. The section outlines Council’s commitment for embedded sustainability in procurement, minimum 30% recycled or resource recovered materials where viable, prioritising carbon neutral and sustainable practices through project decisions. This is developed during Stage 1 – Initiation.

 

Section 2.3.12 of the PMF discusses the obligations to consult Council’s Resource Recovery Register to determine the availability of surplus materials for use on the project, and to manage waste and surplus material disposal on project completion.

 

Status: Action Completed

 

—

 

Action Code: SG-RS-2

 

Action: Investigate and implement life cycle training for all staff. Consider asset life and end of life in regards to infrastructure, material selection and project decision making/ risk assessment

 

Update: Relevant staff have been trained in asset life cycle analysis and infrastructure life cycle, including design life and end of life is considered in project planning & design.

 

Status: Action Completed

 

Climate Change Actions

 

Action Code: CC-WW-1

 

Action: Engage a consultant to develop a carbon emissions baseline / Carbon Footprint for TRC (carbon emissions audit of council operations, services and infrastructure) – dependent on funding

 

Update: Funding obtained for the 23/24 FY. Consultant Engaged 23/24 FY to develop the carbon emissions baseline.

 

Status: Action Completed

 

—

 

Action Code: CC-LCWW-2

 

Action: Investigate opportunities to provide greater incentives to reduce urban heat island in private developments / to reduce heat in urban settings

 

Update: Investigation completed. No incentives recommended at this point in time. Greening and non-greening mechanisms to reduce urban heat island effect have been included in the updated DCP, which was adopted July 2024. Potential to revisit this action once the SB SEPP has been implemented for a while and greening and non- greening cooling mechanisms are in the DCP for a while.

 

Status: Action Completed

 

—

 

Action Code: CC-WW-2

 

Action: Develop a Climate Change Mitigation and Adaptation Road Map to obtain agreeance on our climate future. This Road Map is in addition to the studies, and plans listed in this Action Plan. This will be used to inform decision making processes were approved

by Council.

 

Update: The intent of this action was to engage with community around\ climate change mitigation and adaptation. The outcome would have ideally been reviewed and approved by Council before feeding into the internal and external climate change plans and processes in accordance with recommended practice.

 

Status: On hold

 

—

 

Action Code: CC-WW-3

 

Action: Investigate and establish the necessary tools and mechanisms to assist asset owners easily maintain carbon emissions tracking on an on-going basis

 

Update: Work continues with asset owners to ensure relevant data is collected and carbon emissions tracking continues. Liaison with other Councils regarding what other tools are available, as well as understanding how carbon emissions tracking could be improved using internal technology upgrades. Outcome was to use the manual spreadsheet method developed when the baseline was established. The CPI and emissions index are updated yearly before inputs are gathered and implemented manually. Opportunity exist to revisit this in subsequent strategies as Council’s system improve and tracking technology improves. This is important as the current process is very time intensive.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-WW-4

 

Action: Improve communication externally to ensure community is aware of the work occurring in relation to addressing natural hazards and sustainability (including water, waste, energy, natural environment, circular economy, and climate change).

 

Update: Sustainability has been included in the TRC newsletter in order to improve communication externally.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-WW-5

 

Action: Engage a consultant to develop and implement a climate change risk and adaptation plan – This is reliant on funding

 

Update: Based on learnings from other Councils within the Local Government Sustainability Network further work is required in relation to this action before implementation to ensure no duplication across Council’s activities. Further work is required

 

Status: On hold

 

Comment: Can this update be expanded on please? What additional work is required?

 

—

 

Action Code: CC-WW-6

 

Action: Establish the necessary tools, mechanisms and management structure for the effective implementation of climate risk and adaptation strategy – This is reliant on funding

 

Update: This action is reliant on action CC-WW-5.

 

Status: On hold

 

—

 

Action Code: CC-WW-7

 

Action: Develop and implement an Emissions reduction plan (Net Zero) – This is reliant on funding and the completion of the carbon emissions audit

 

Update: See comments in CC-WW-5

 

Status: On hold

 

—

 

Action Code: CC-WW-8

 

Action: Engage a consultant to conduct a gap analysis, & 1st Pass climate assessment exposure assessment to inform the climate change risk assessment. Identify if a 2nd and 3rd pass assessment is required. These will be required if we intend to develop the Adaptation plan

 

Update: No action on this item

 

Status: On hold

 

—

 

Action Code: CC-WW-9

 

Action: Collate existing emissions tracking data from TRC Operations and Offices

 

Update: 22/23 FY data was incorporated within the development of the Carbon Emissions Baseline.

 

Status: Action Completed

 

—

 

Action Code: CC-WW-10

 

Action: Engage/ partner with other organisations and community groups to explore opportunities to improve performance in relation to urban greening, environmental sustainability clean energy, mitigation and adaptation

 

Update: Examples include: Sustainability Team engaging with local government sustainability networks to learn from other Councils, as well as participating in grant programs jointly with other Councils to improve sustainability outcomes for our region. Partnering with HIA to run a session in Tamworth as part of Adult Learners week to upskill the local construction industry on requirements under the Sustainable Buildings SEPP.

 

Council has also been collaborating with Regional NSW to identify potential opportunities for our region relating to clean energy and circular economy. Council is also collaborating with research institutes such as University of Newcastle to relation to some of these areas. This action has been extended to include 25/26 FY.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-WW-11

 

Action: Partner with other agencies to boost community awareness and education about biodiversity

 

Update: Liaised with Landcare and state gov in relation to the roll out their biodiversity stewardship info sessions for land holders.

 

Status: Action Completed

 

—

 

Action Code: CC-WW-12

 

Action: Advocate for funding for public private partnership opportunities related to climate change

 

Update: Investigation undertaken. Advocated for this through Sustainability Advantage. Potential benefits from investing resources into advocating for this further weren’t substantial enough at this point in time

 

Status: Overdue or not started

 

—

 

Action Code: CC-WW-13

 

Action: Where viable and where the land doesn’t have significant biodiversity value, use identified Council land to generate Carbon credits

 

Update: Initial investigation completed 2022 with the outcome showing this to be cost prohibitive at this point intime. There may be potential to build on the outcome of the 2025 Biodiversity Baseline Study for Council land in subsequent years where grant funding becomes available.

 

Status: Action Completed

 

—

 

Action Code: CC-WW-14

 

Action: Investigate employing a fulltime Resilience Officer to support council and community achieve tangible projects

 

Update: It was hoped grant funding would be provided for 3 years to employ this officer. Grant funding available has been limited to 12 months and therefore employing the position has not progressed.

 

Status: Action Completed

 

—

 

Action Code: CC-WW-15

 

Action: Investigate developing climate resilience community education initiatives, including adaptation to climate change and mitigation of climate change impacts

 

Update: Investigation was completed. Council engaged with Landcare to understand opportunities to work together in this space.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-WW-16

 

Action: Institutionalise climate resilience into all aspects of municipal operations and policies where feasible

 

Update: Reliant on creation on climate resilience officer role See earlier comments

 

Status: Overdue or not started

 

—

 

Action Code: CC-WW-17

 

Action: Where beneficial, develop a process to review and consider carbon footprint of infrastructure over whole of life.

 

Update: No action on this item

 

Status: Overdue or not started

 

—

 

Action Code: CC-WW-18

 

Action: Track all scope 1, 2 and 3 emissions from operational buildings and key sites across the organisation

 

Update: The Carbon Emissions Baseline was developed 23/24 FY, processes were then put in place to fill data gaps identified during this process for subsequent years. Data from the 24/25 FY has been collected, and is in the process of being input and finalised.

 

Status: Completed for 24/25 FY but ongoing

 

Comment: Is there an expectation for when this data will be released publicly?

 

—

 

Action Code: CC-WW-19

 

Action: Provide guidance and support to encourage businesses and industries located, or looking to locate to the Tamworth LGA, that are taking action to reduce their carbon emissions, or that are actively reducing their environmental impact

 

Update: This was commenced for select industries where Council’s assets were relevant, however there is room to expand on this for other industries.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-WW-20

 

Action: Investigate rolling out resilience training to key internal staff to incorporate this into decision making processes

 

Update: See earlier comments about Resilience Officer

 

Status: Action Completed

 

—

 

Action Code: CC-LC-1

 

Action: Investigate how to incorporate controls in the DCP relevant to reducing carbon emissions in the built environment

 

Update: The establishment of the sustainable building SEPP replaced the need to include carbon emissions reduction in the DCP. Council organised an information session as part of adult learners’ week for HIA members to help them understand what the SB SEPP meant for their designs.

 

Status: Action Completed

 

—

 

Action Code: CC-OGMWWRS-2

 

Action: Review and update local-level policies, planning regulations, design standards and guidelines for future and new infrastructure development to ensure they consider and integrate climate projections and urban resilience in design and construction

 

Update: Climate change related events have been included in the Hazard Risk Register Construction (May 2025). Environmental considerations are also included in the Environmental Aspects Register and Construction Register of Interested parties.

 

Climate Change has been included in Council’s Minimum Standards for Design from a Stormwater and Flooding perspective.

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-LEMC-1

 

Action: Review the Emergency Management Plan to identify whether future climate projections are considered – DAP

 

Update: Emergency Management Plan endorsed 10 May 2024. No specific outcomes in relation to climate change (e.g. flood response is appropriate, even if floods become slightly more prevalent).

 

Status: Action Completed

 

—

 

Action Code: CC-OGMWWRS-1

 

Action: Incorporate the consideration of future climate projections, intergenerational equity and precautionary principles into the decision making risk management framework

 

Update: Council participates in annual continuous improvement pathway self-audits that identifies the impacts of climate change as contributing factors that should be address on council assets such as playgrounds, footpaths, bridges, buildings etc. Each year actions are identified and shared with asset owners.

 

The organisational operational risk register is under development and incorporates the risks of climate change on a number of areas.

 

From a Stormwater and Flooding perspective, Climate Change has been included in Council’s Minimum Standards for Design

 

Status: Completed for 24/25 FY but ongoing

 

—

 

Action Code: CC-RS-1

 

Action: Develop the Nundle and Woolomin early flood warning system and install associated infrastructure

 

Update: Implemented in 2022

 

Status: Action Completed

 

—

 

Action Code: CC-OGM/RS-1

 

Action: Investigate building a ‘Disaster Dashboard’ and establish early warning systems for key climate hazards – dependant on funding

 

Update: No action on this item.

 

Status: Overdue or not started

 

—

 

Action Code: CC-LCRS-1

 

Action: Review flood mapping to confirm whether the current level is adequate to consider future climate projections and make relevant recommendations

 

Update: Ongoing – We are continually working to update our flood modelling to ensure it remains current and considers the impact of climate change

 

Status: Completed for 24/25 FY but ongoing