Tonight on Council – 08/09/2026
The headline this week is that now that we’re at the halfway point of the term, the Mayoral term of two years is up, and an election for the Mayor position over the remaining two years needs to be carried out. The one-year Deputy Mayor term is also up, so a vote on Deputy will take place too.
Outside of that though, this is our third fortnight in a row of having a relatively light agenda.
Governance, Strategy and Finance
Items 6.1, 6.2, 6.3, 6.4, and 6.5 – Election of Mayor and Deputy Mayor
As multiple items relate to the process of electing and appointing a Mayor and Deputy Mayor and directly supersede each other, I thought it would be easier to combine them for this section of my write-up.
Item 6.1 is to appoint the General Manager as the returning officer to facilitate the election process. This is under the advice in Schedule 7 of the Local Government (General) Regulation 2021 (which sets out the procedures for the election of the mayor and deputy mayor by councillors at a council meeting) that states the General Manager (or a person appointed by the General Manager) is the returning officer.
With the General Manager facilitating, we then move onto item 6.2, which is to receive information on the methods of voting we are able to select for an election. If only one Councillor nominates, that person takes on the role unopposed. If more than one Councillor nominates for a position, the council then decides whether the election is to proceed by preferential secret ballot, ordinary secret ballot, or open voting with a show of hands.
Both preferential and ordinary ballot methods operate the same as a standard local, state, or federal government election. Councillors will record their preference on a piece of paper, either a single name for an ordinary ballot or ranked in order of preference for a preferential ballot. These pieces of paper will then be revealed and counted.
If there are only two candidates, the candidate with the higher number of votes (or first preferences in the case of preferential voting) is elected.
If there are only two candidates and they are tied, the one elected is to be chosen by lot. By lot essentially means the names of the tied candidates will be placed in a hat, and the candidate drawn from the hat will be elected.
If there are three or more candidates, the one with the lowest number of votes (or the lowest number of first preferences) is to be excluded. If an ordinary ballot is being used, another round of voting will commence. If a preferential ballot is being used, ballots that had the eliminated candidate as their first preference will be transferred to the voters’ second preference, and ballots will be counted again.
This will repeat until only two candidates remain. If at any stage during this process with three or more candidates, two candidates are tied for the lowest vote, these two candidates will be drawn by lot, but the candidate drawn will be eliminated.
In the past, TRC has tended to use the method of electing Mayor and Deputy Mayor by secret ordinary ballot. At the Mayor and Deputy vote at the beginning of the term the vote to choose this method of voting was passed 6-3 (with Mears, Rodda, and myself instead supporting a show of hands). A secret ordinary ballot was used at last year’s Deputy Mayor election.
Item 6.3 is to vote to formally determine the method of voting we’ll use. Once we have the voting method selected, we move onto items 6.4 and 6.5 where the returning officer calls for nominations for the roles of Mayor and Deputy Mayor respectively. And as per above, if more than one nomination is received, we proceed to an election.
Item 6.6 – Mara Ngali Partnership Committee – Terms Of Reference
The Mara Ngali Partnership Agreement between TRC and the Tamworth Aboriginal Community Controlled Organisations (TACCO) was signed last year. As I’ve written about previously, this formal partnership is the first of its kind in NSW, and it recognises TACCO as the peak Aboriginal governance body for the Tamworth LGA. This item formalises the next step: the establishment of the Mara Ngali Partnership Committee, a joint Steering Committee that will oversee the design, implementation, monitoring, and evaluation of the Tamworth Closing the Gap Strategy and Implementation Plan.
I’d encourage anyone with an interest in this work to read the Terms of Reference (ToR) in full, because, and this goes to show just how fun I am, I find them genuinely exciting. The Committee is grounded in what the document calls the Mara Ngali Cultural Governance Principles, which affirm that Aboriginal cultural governance sits alongside and is respected within statutory local government governance frameworks. The principles include that decisions are made by consensus so every voice is heard and respected, that all people sit as equals with the role of Chair being functional rather than hierarchical, that proper time is given for discussion, reflection, and community input, and that decisions are owned collectively by the group rather than by individuals. In the world of rigid government procedure, I think a willingness to embrace this sort of structure is really cool, and I’ve only ever seen other meeting structures internally within the Greens.
To expand on consensus decision-making a bit, because it’s something that I personally really like, consensus doesn’t mean unanimous agreement, but it does mean working together until everyone can support or at least live with a decision. In the context of this ToR, it states that no member should be pushed into a decision that goes against their core cultural or organisational responsibilities. The process involves clarifying the item, sharing perspectives, shaping a proposal together, and checking for agreement. If agreement can’t be reached, the Committee can take a break, define the reasons for objection, seek more information, or return to the matter at a later meeting.
Under the ToR, Aboriginal Elders hold a standing cultural governance role within the Committee, providing cultural authority and guidance, and can advise the Committee to pause, defer, or reconsider matters where cultural integrity may be at risk. Where matters directly affect cultural heritage, sacred knowledge, or community safety, Elder guidance must be sought before formal resolution.
On membership, voting members comprise one TACCO representative per member organisation and an equivalent number of TRC representatives including Councillors, Executive, and Senior Staff. Quorum requires 50% equal representation from TRC and TACCO plus one voting member, and without quorum no formal decisions can be made. Meetings will be held at a minimum every two months, with venues rotating between TRC, TACCO, or on Country where appropriate.
I reckon this is a genuinely exciting development for Tamworth. The Terms of Reference reflect the kind of partnership that puts cultural safety and shared governance at the centre, rather than treating them as add-ons. The recommendation is to adopt the Terms of Reference and nominate Councillors to it.
Item 6.7 – Financial Assistance Grants Program 2026/2027
This meeting is pretty annexure heavy in that the reports in the business paper itself are very slim, and the meat of the information can be gathered by reading through the attached documents. This item continues that theme.
This item presents a letter from the Chair of the NSW Local Government Grants Commission, Linda Scott, addressed to the Mayor and tabled at Council’s request.
The headline figure is that TRC’s estimated Financial Assistance Grant entitlement for 2026-2027 is $15,135,577, representing a 5.6% increase on the 2025-2026 final entitlement of $14,327,309. That increase is made up of a General Purpose Component of $8,913,705 and a Local Roads Component of $6,221,872.
Nationally, the total FA Grants pool for 2026-2027 is $3.62 billion, comprising $2.5 billion for the General Purpose Component and $1.1 billion for Local Roads. NSW’s share of the General Purpose Component is $779 million, representing a 3.95% increase on last year’s final figure. The increase in national entitlements was driven by adjustments to CPI and population shares.
The 5.6% increase the Tamworth region is set to receive is welcome, but it’s worth putting the broader FA Grants picture in context, because there’s a national story developing right now that’s relevant here.
Financial Assistance Grants have been a cornerstone of federal funding for local government since 1974. The value of these grants as a percentage of Commonwealth taxation revenue has halved over the past 30 years, falling from one per cent in 1996 to just 0.5 per cent today. This major reduction in funding to local governments has been coupled with more and more responsibilities being shifted onto Local Government (from both State and Federal Governments) without the funding to carry it out, and is a major reason that Councils all over the State, including TRC, have been applying for Special Rate Variations in recent years.
The campaign from the Local Governments across the nation has been running for years, but it gained significant momentum earlier in 2026. At the 2026 National General Assembly of Local Government in June, a key focus was the sector’s united advocacy for fairer Financial Assistance Grants, including support for an emergency motion calling on the Australian Parliament to restore them to one per cent of federal taxation revenue annually. All 538 ALGA member councils voted for that emergency motion, seeking an immediate funding increase of $3.5 billion.
That momentum carried into the ALP’s 50th National Conference in Adelaide in late July. A proposal to establish a pathway to restore federal Financial Assistance Grants to one per cent of Commonwealth taxation revenue was under consideration at the conference. The conference backed a Federation Compact that would establish a framework between local and federal government aimed at increasing Financial Assistance Grants, strengthening local government capability in key service areas, and allowing Roads to Recovery funding to be used more flexibly.
This is encouraging, but I’m not holding my breath for immediate action. A conference resolution is not a budget line and there’s a lot of work to do to get it into Federal Government policy.
The recommendation is to receive and note the letter.
Item 6.8 – Local Government Professionals International Scholarship
Each year, Local Government Professionals NSW offers international scholarships to conferences in New Zealand, the United States, Canada, Japan, and the UK. Councillors approved Karen Litchfield, Acting Executive Manager Strategy and Performance, to attend the 2026 Canadian Association of Municipal Administrators Conference at our 24th of March meeting early this year. Karen has prepared a delegate’s report on her experience, which again is included in full in the meeting annexures.
The CAMA conference was held in Whistler, British Columbia from 25 to 27 May 2026, bringing together Chief Administrative Officers from across Canada. Karen attended representing LG Professionals and Tamworth Regional Council, alongside delegates from Randwick City Council, Liverpool City Council, and Bland Shire Council.
Karen’s report details how familiar the challenges faced by Canadian councils were. Cost shifting from the province to local government (what Canadians call ‘downloading’), limited resources, and managing homelessness all featured across conference sessions. The conference had a strong focus on leadership, with sessions including a workshop on Power Intelligence, examining where power comes from and how to use it consciously, and a Leading with Civility workshop on building trust when tensions rise.
Following the conference, Karen and two other delegates visited two councils near Vancouver. At the City of Richmond they toured the Richmond Olympic Oval, built in two years for the 2010 Winter Olympics entirely with the city’s own funds and since repurposed into a multi-functional facility including two ice rinks, six basketball courts, rock climbing, an indoor running track and gym. The facility has also partnered with the International Olympic Committee to host an Olympic memorabilia exhibition. They then visited the City of Maple Ridge, whose leadership team presented on how the council has redesigned its organisational structure and culture around a ‘one city’ vision, with over 1,000 staff, compulsory union membership, and 97% electrification running on hydro power.
Karen’s overall conclusion is that the experience is one she would highly recommend, and she encourages future scholarship recipients to participate in the site visits in particular. The recommendation is to receive and note the report.
Item 6.9 – Tamworth Central Sports Fields Masterplan 2026
This item is asking Councillors to formally adopt the Tamworth Central Sports Fields Masterplan 2026.
The Tamworth Central Sports Fields precinct is one of Tamworth’s most heavily used sport and recreation areas, encompassing the Plain Street Sporting Fields, the Carter Street and Riverside Sporting Complex, and the Gipps Street Sporting Fields. For the purposes of the Masterplan the precinct has been divided into six key areas: Plain Street Fields (Area 1), the land bordered by Plain Street, Ebsworth Street, Carter Street, and the viaduct (Area 2), Baseball and Riverside 3 (Area 3), the land bordered by Bridge Street, Carter Street, Ebsworth Street, and the viaduct (Area 4), Riverside 1, 2, and 3 (Area 5), and Gipps Street Sporting Fields and Cross Park (Area 6).
The goal for the Masterplan is to provide a long-term direction for the precinct rather than treating each field in isolation. Its stated key objectives include improving sporting infrastructure, accessibility and connectivity, community health and wellbeing, event-hosting capacity, sustainability and resilience, multi-use opportunities, and operational efficiency.
The Masterplan went through a development process involving site analysis, a Project Control Group with representation across Council divisions, a Project Advisory Group made up of local sporting community representatives, public exhibition, and a final round of refinement based on community feedback. The draft was on public exhibition from the 15th April to 14th May 2026, receiving 96 feedback responses from community members, local sporting clubs and state sporting organisations, which is a solid level of engagement for a plan of this kind.
The feedback identified consistent themes around sports field quality and drainage, lighting, amenities, accessibility, parking, and the precinct’s capacity to accommodate growing participation and regional events. A number of changes were incorporated into the final Masterplan as a direct result of that feedback, including adding a pedestrian bridge connection across the gully in Area 2 to improve connectivity between sporting areas, adding sports field lighting to the Field of Dreams 1 and 2 in response to recurring feedback about training and competition capacity, adding a fencing review for those same fields, adding a shared path connection linking Area 6 with the external active transport network, strengthening the shared path network action to explicitly connect fields, car parks, amenities and surrounding streets, and adding precinct-wide actions addressing car parking capacity, traffic calming and pedestrian safety, and a drainage assessment and staged upgrade program.
Being a Masterplan, Councillors adopting it doesn’t mean all identified actions will be implemented straight away. Individual projects will be carried out subject to feasibility assessments, detailed design, funding availability and weighed against other TRC priorities, with external grant funding to be pursued as opportunities arise. The report also states that there are no funds currently allocated to implement the plan.
Environment And Planning
Item 7.1 – Adoption Of New And Revised Fees And Charges For 2026/2027
This item follows on from the fees and charges amendment that came before Councillors at our 14th July meeting. We resolved in July to place two minor amendments to the 2026/2027 Fees and Charges Schedule on public exhibition for 28 days, with a further report to be brought back only if submissions were received. One submission was received, so this report presents the outcome of the exhibition period and seeks formal adoption.
The first is a standard Drainage Diagram fee that was left out of the exhibited schedule. Drainage Diagrams are required documents for property sales under the Conveyancing (Sale of Land) Regulation 2017, and Council issues them regularly in its role as the local sewerage authority.
The second is an update to the description of the Conveyancing Certificates – Outstanding Notices fee to include reference to a Schedule 5, Clause 41 Certificate, which is the current name for what was previously known as a Section 121ZP Certificate following legislative reforms. The certificate itself serves the same purpose, identifying any current notices, orders or development-related compliance matters affecting a property under planning legislation.
The one submission received during the exhibition period raised concern that the revised fees represented an overcharge. The TRC response is that neither fee has been increased: the Drainage Diagram fee is a reinstatement of a fee that was always there but was accidentally omitted from the schedule, and the Outstanding Notices fee description has been updated solely to reflect the legislative name change from Section 121ZP Certificate to Schedule 5, Clause 41 Certificate.
Infrastructure And Services
Item 8.1 – Tamworth Local Transport Forum – 29 July And 5 August 2026
This item updates Council on recommendations from the two Tamworth Local Transport Forum meetings held on the 29th of July and 5th of August. As always, the full minutes are worth a read in the annexures, but some notable inclusions are traffic management endorsements for the A Winter’s Night event on Peel Street and the Tamworth Regional Skywalk grand opening, both of which have already taken place.
Other items endorsed include Armstrong Street intersection upgrades in Westdale for heavy vehicle access, George Street causeway replacement signage in Moonbi, removal of the bus zone on Hercules Street in West Tamworth, No Stopping signage along Ebsworth Street in West Tamworth to protect new pavement, and traffic management for the Westpac Ride for the Chopper charity mountain bike ride on 18 September.
The report states that the Forum also reviewed the UNE Tamworth campus signage and line marking plan at 545 Peel Street, and supported concerns raised by TRC about the absence of bus stop infrastructure, inadequate shared path signage, tree planting risks to infrastructure, and kerb ramp widths. Those concerns are to be addressed before the plan is finalised.
Item 8.2 – Tamworth Regional Parking Strategy – Implementation Update
This item provides an update on how the Tamworth Regional Parking Strategy, adopted in February 2025, has been tracking since implementation. The full report is attached to the business paper for anyone who wants more detail. But for the sake of this summary I’ll focus on the CBD parking meters, and that makes up the bulk of the report.
The changes to paid parking in the CBD have resulted in 203 fewer metered spaces and 13 fewer parking meters than the previous arrangement, with all off-street all-day parking now free. The intent is to push long-stay parkers to the free off-street carparks, freeing up higher-turnover spaces closer to shops for people making shorter visits. Early signs suggest that’s working, with a sharp increase in utilisation of off-street all-day parking areas and a slight decrease in average length of stay on Peel Street, indicating improved turnover. It also states that there’s been no discernible reduction in traffic volumes along Peel Street.
Sixteen additional on-street disabled parking bays have been added to the CBD, which is a welcome improvement for accessibility, although there is still some work to do to install more kerb ramps.
Income from parking fines has increased sharply from April onwards, about six months after paid parking commenced on Peel Street. The report attributes this to a softer enforcement approach in the early months, additional parking officer capacity, and a stronger recent focus on enforcement. The report states that the expectation is that income from fines will reduce over time as people adjust their habits and choose to pay the parking fee rather than risk a fine.
The report also states that the Griffin Avenue and Hands of Fame carparks have been identified for improvements, to be funded from the Parking Reserve, which is fed by parking fees and enforcement income rather than general rates revenue.
Community Services
Item 9.1 – Place Management – Review Of Section 355 Committees
I’m disappointed to see this item. It’s a request to formally dissolve two Section 355 Committees that are no longer operational.
Section 355 Committees allow Council to delegate management functions for facilities and reserves to community members. You can see a list of them at this link, and will see a trend that TRC’s Section 355 Committees tend to manage community halls or recreation grounds in the region’s outlying communities.
https://www.tamworth.nsw.gov.au/about/the-council/groups-and-committees/section-355-committees
The Niangala Recreation Reserve S355 Committee no longer has a Committee Executive, and the report advises it has been unable to meet its legislatively required governance obligations for some time. As such, it’s being recommended that the committee be dissolved, management of the reserve returned to TRC directly, and it’s advised that TRC is working with the Niangala Memorial Hall Committee on a new Community Mower Agreement to assist with reserve maintenance.
The Manilla Showground S355 Committee has been in hiatus since at least May 2023, with no meeting minutes received by Council since that date. In the interim, Council’s asset management team has been liaising directly with site stakeholders and users. It’s likewise recommended that as this function is being fulfilled by TRC, this committee also be dissolved.
Personally, I would like to see some sort of merging of historic Section 355 Committees and the recently established Precinct Advisory Committees across the region’s outlying communities. The Precinct Committees are still finding their feet though, and I have more opinions on that. But I want to speak more with community members on those committees and fellow councillors to organise my thoughts more before making public comments.
Item 9.2 – Proposed Licence Renewal – Part Lot 7300 Dp 1152789
Rounding out the meeting we have a straightforward item. The Tamworth and District Model Engineers’ current licence agreement for the Miniature Railway in Victoria Park is coming to an end, and the club has expressed interest in renewing for a further five years from the 25th of October 2026 to the 24th of October 2031.
The proposed licence terms are the same structure used across Council’s Sports and Recreation licences: a commencing rental of $597.02 plus GST per annum, increasing by 3% annually, with the club responsible for outgoings including fire compliance, rubbish removal, and public liability insurance. Rental income will be allocated to the Sports and Recreation operational budget.
The recommendation is to authorise the Mayor and General Manager to negotiate the licence renewal on those terms.