Tonight on Council – 11/11/2025
We’re going to have a development-focused meeting this fortnight. Secondary dwellings on rural lands, the Stratheden subdivision in Oxley Vale, and Special Entertainment Precincts are all on the agenda. But we also have some interesting reports on Council finances and the lifespan of the Forrest Road Landfill Facility (also known as the Tamworth Tip).
Environment and Planning
Item 7.1 – Amendment to the Tamworth Regional Local Environmental Plan 2010 – Planning Proposal – Secondary Dwellings in Certain Rural Lands
This item is seeking Councillor approval to amend the Tamworth Regional Local Environmental Plan (TRLEP) via a Planning Proposal (originally prepared in November 2024) to allow for the construction of secondary dwellings with development consent on certain areas zoned for RU1 – Primary Production and RU4 – Primary Production Small Lots. But be warned, the information here is dense with Local and State Planning terminology. I’ll do my best to summarise.
As a quick recap of these terms, a Local Government’s Local Environmental Plan is a statutory document that provides the legally binding framework for land use and zoning within that Council area. A Planning Proposal in the context of the NSW planning system is a document that outlines a proposed change to a LEP.
This change is something that has been called for from the community for a fair while, and was a major proposal of the forthcoming Rural Lands Strategy to increase housing options within the Local Government Area (LGA) and to assist primary production operations within the LGA with succession planning and ageing in place options.
Although the focus here is on farming lands, it’s worth looking at this in context that under the TRLEP secondary dwellings on a lot are already permitted under RU5 – Village, R1 General Residential, E1 – Local Centre, and C3 – Environmental Management. On top of this the State Environmental Planning Policy (Housing) 2021 permits secondary dwellings in all residential zones including R2 – Low Density Residential and R5 – Large Lot Residential.
There are obviously complexities and conflicts that need to be managed along with this proposed change though, and the proposal does have limitations included to address these.
The definition of a secondary dwelling in the TRLEP requires that it can only be undertaken in conjunction with another primary dwelling. So rather than introducing a new, separate residential land use on a lot it’s considered that a secondary dwelling is an intensification of that existing residential land use. Also under the proposal these secondary dwellings would be subject to the following principal development standards under Clause 5.5 of the TRLEP:
- Secondary dwellings must not exceed either 130m² or 25% of the total floor area of the principal dwelling (whichever is the greater)
- The distance between the secondary dwelling and the principal dwelling must not exceed 100m
There’s also been mapping included for which areas of the LGA this proposed change would apply to. Rather than being applied uniformly to all RU1 and RU4 zoned lands, some areas have been excluded with a view to minimise land use conflicts where an additional dwelling would raise an issue. The most notable of these being the significant area included in the upcoming Naomi Regional Jobs Precinct being introduced by the State Government. This forthcoming precinct aims to identify lands for intensive livestock agriculture, as well as preventing encroachment on those identified lands from development such as secondary dwellings.
Over the course of consultation for this Planning Proposal (both with community and with relevant government agencies) the NSW Environment Protection Authority raised that identifying potential conflicts early can help protect existing operations and future residents. Upon further analysis, the cluster of scheduled activities in Glen Artney and Westdale have been identified as an area of potential land use conflicts if additional sensitive receivers are permitted under the planning proposal. The scheduled activities include the abattoirs, an earthmoving business and Westdale Sewerage Treatment Plant.
As a result the secondary dwelling inclusion map has been amended to exclude areas around the abattoirs and Westdale Sewerage Treatment Plant (200m buffer from lot boundary). The report advises this is to protect receivers/residents from land use conflicts, protect industry from possible encroachment or limitations, and ensure compliance with regulatory requirements.
The below link shows the draft exhibited map of the LGA showing proposed secondary dwelling inclusion areas. And the meeting annexures show updated mapping reflecting the changes made after the consultation period.
There are also two Section 9.1 Ministerial Directions (Directions issued by the Minister for Planning to relevant planning authorities under section 9.1 of the Environmental Planning and Assessment Act 1979) that were identified as remaining unresolved due to the inconsistency of the Planning Proposal in a letter from the Department of Planning, Housing and Infrastructure (DPHI) accompanying the Gateway Determination. Really quick, a Gateway Determination is a State Government document which decides whether a planning proposal to alter land uses through methods such as rezoning or amending development standards should proceed. See this post from the 12th of November 2024 meeting for more info and a fun look into what the issues before Council a year ago were:
https://www.facebook.com/share/p/17MG8L7FAJ/?mibextid=wwXIfr
The two areas were specified as relating to Direction 4.3 Planning for Bushfire Protection and Direction 5.3 Development Near Regulated Airports and Defence Fields.
For Direction 4.3, the Planning Proposal seeks to permit secondary dwellings in certain areas of the RU1 – Primary Production and RU4 – Primary Production Small Lots zones. A significant portion of these lands are likely mapped as bushfire prone land. Consultation has been undertaken with the NSW Rural Fire Service (NSW RFS) in accordance with the Gateway Determination.
The NSW Rural Fire Service stated in its response: “Future dwellings will require development consent. Where on mapped bushfire prone land, dwelling(s) will be required to satisfy the requirements of Planning for Bushfire Protection Guidelines.”
The report advises that the above would be standard practice as part of the development application process. Therefore, in accordance with the Gateway Determination, Council has been advised of the DPHI Secretary’s agreement to the inconsistency with Direction 4.3 Planning for Bushfire Protection.
For Direction 5.3, the Planning Proposal seeks to permit secondary dwellings on certain lands adjacent and in proximity to the Tamworth Regional Airport.
The Civil Aviation and Safety Authority (CASA), Airservices Australia and Manager of the Tamworth Regional Airport (who it should be noted is employed by TRC and the Tamworth Airport is a Council-owned and managed facility) were consulted in accordance with the Gateway Determination.
Neither CASA nor the Manager of the Tamworth Regional Airport raised objections as future secondary dwellings would be subject to a merit assessment. No response was received from Airservices Australia.
The report advises that in accordance with the Gateway Determination, Council has been advised of the DPHI Secretary’s agreement to the inconsistency with Direction 5.3 Development Near Regulated Airports and Defence Fields.
Item 7.2 – Exhibition of the Tamworth Regional Council Development Control Plan 2010 – Site-Specific Stratheden Residential Precinct, Oxley Vale
This item is asking Councillors to place draft site-specific development controls for the Stratheden Precinct off Manilla Road past Oxley Vale onto public exhibition for at least 28 days, with a future report to come back to Councillors outlining any submissions received. This is a major planned land release/city expansion and specifically mentioned in Blueprint 100.
In the item above I mentioned the TRLEP. As opposed to a Local Environmental Plan, a Development Control Plan sits underneath a Council’s LEP document and provides planning and design guidelines for development. In this instance TRC is looking to implement site-specific development controls ahead of construction beginning for this new housing subdivision to ensure this new development adheres to good urban design and improves Tamworth’s mix of housing diversity (which was identified as a key action from TRC’s Housing Strategy).
This is the sort of stuff I find really exciting to be able to weigh in on as a Councillor. A lot of what we deal with as a Council is paying the price for poor planning decisions in the past in already developed areas. That work is important and shouldn’t be written off as too hard to address, but by comparison greenfield developments are a blank canvas in a lot of ways.
Planning for housing diversity and affordability, proactively planning green space and urban canopy to combat urban heat, planning blue and green corridors to both boost amenity and biodiversity while utilising water-sensitive urban design, active transport corridors to make sure areas are walkable/rideable and well connected. These are things we can address in high-level Site-Specific Development Controls.
There’s too much covered in the draft site-specific development controls to go over here, but I would recommend having a read of them in the meeting annexures. Assuming this item passes, I’ll provide an update for when the public exhibition period is open for community feedback.
Item 7.3 – Planning Proposal – Establishment of the Tamworth Special Entertainment Precincts
The other Planning Proposal we’ll consider this meeting is a request for a Gateway Determination from the DPHI to amend the TRLEP to establish x2 Special Entertainment Precincts (SEPs) in the Tamworth CBD, and at the Sports and Entertainment Precinct on the southern entrance to Tamworth.
A SEP is a designated area where live music and entertainment activities can occur with reduced regulatory restrictions to help support night-time economy industries. Primarily, they give Councils more flexibility in managing restrictions around noise, hours of operation or outdoor activities (such as outdoor dining) for licensed premises.
SEPs are a State Government initiative, originally introduced in 2022. The establishment of SEPs in Tamworth has been on the agenda for a few years now, but we look set to still be a relatively early adopter of SEPs. Councillors originally resolved to kick off the process of establishing SEPs back at our 25th of February meeting. Since then various community consultations have been undertaken with community members, local businesses, venue owners, and state government agencies. TRC was also successful in obtaining a grant of $200,000 from the State Government to assist in supporting the development and implementation of the proposed SEPs.
While thoughts on the need for SEPs immediately go to metropolitan Sydney, especially after the impact of lockout changes under the former coalition government during the last decade, I actually think this is a very auspicious time to be considering SEPs for Tamworth with a view to future development. We’re at an interesting point as we make the jump from a large country town to a small city, and this is the sort of future-proofing that, if planned for now, could avoid many issues down the line.
The immediate consideration for SEPs in Tamworth goes to help secure the future of the Country Music Festival. This would give venues certainty that they can continue to put on live music into the future even with the potential for new infill development. However, I think the same argument can be applied to building out Tamworth’s night-time economy in line with increased density, especially around the CBD.
TRC has identified a need for, and expressed desire for, higher-density development in the CBD, such as shop-top housing and apartments. I’m also a strong proponent of medium-density mixed-use zoning (building up more instead of out), and the CBD and areas around Bridge Street are the obvious places in our region to focus this sort of housing.
Given that this sort of development largely hasn’t happened in our region yet, the establishment of an SEP could also work the other way and help establish protections for future residential properties surrounding licensed premises by requiring developers to meet certain construction standards in the DA, like soundproofing or dampening. It would also help establish vibrant urban neighbourhoods for those wanting to live close to bars, venues, breweries, and restaurants, which would then have the wider effect of building that night-time economy for the benefit of the wider city and region to patronise.
On that front, Council staff will also be developing a Night-time Economy Strategy to complement the establishment of these SEPs. Early consultation via community and stakeholder engagement have recently been undertaken by Council staff, and you may have seen advertising by Council on these recently. Feedback on this future Strategy has also been sought from various of the Council Committees I sit on. Something that has been consistently raised in these committees, and notably by the Youth Council, is the desire for night-time economy efforts to be multifaceted and not primarily revolve around alcohol.
As part of requesting a Gateway Determination the Planning Proposal is required to be publicly exhibited and the motion is calling for a future report to come back to Councillors outlining any submissions received for the Planning Proposal and related draft Precinct Management Plan (a required supporting plan to facilitate management of entertainment sound and to establish trading hours within the SEPs) and draft Development Control Plan changes.
Also, a requirement of the NSW 24-Hour Commission (a State Government Department in charge of night-time economy initiatives across the state), following public exhibition of the Planning Proposal and subject to Council’s adoption, an initial 12-month trial period would first apply to the operation of the SEPs. This trial has the goal of enabling monitoring of their operation and assessment of their success against the objectives identified in the Draft Precinct Management Plan prior to the SEP being formally established. A Special Entertainment Precinct Project Advisory Group comprising TRC, Transport for NSW, Tamworth Liquor Accord, NSW Police, Department of Health and business/community members has been established to monitor the SEPs’ operation.
Infrastructure and Services
Item 8.1 – Forrest Road Landfill – Conceptual Landfill Staging and Final Landform
In a change of pace, item 8.1 is a report summarising the findings of a review by a consultant, Anderson Consulting, who Council hired to optimise the landfill staging and final landform design of the Forrest Road Waste Management Facility (or the Tamworth Tip). This in turn allows for future estimates of preparation, maintenance and capping/rehabilitation costs to be budgeted over extended periods of time.
The headline good news from this report is that as a result of this suggested optimisation the total estimated remaining lifespan of the facility has been increased from 31 years and a potential landfill capacity of 2,772,472 cubic metres (as referenced in the Site Master Plan from 2020) to 59 years and a potential landfill capacity of 5,313,110 cubic metres. It’s notable though that this is dependent on the amount, and type, of landfill received for disposal.
It’s proposed that further landfilling in the north east corner of the facility be carried out to maximise use of existing landfill space. Landfilling in the area is expected to commence in late 2026 and continue for a further four years before the area is capped and plantings for a visual buffer are carried out. The issue that will arise from this though is certain areas of Forrest Hills adjacent to the landfill will be able to see work in this area during landfilling as the topography of the north east corner is high. From there landfilling will then progress generally in a southerly direction.
In approximately 10 years’ time landfilling operations are proposed to shift to the western side of the facility currently known as the quarry. The issue with this is that this area of the facility isn’t licensed by the NSW Environmental Protection Authority for landfilling, and it’s advised that works associated with gaining an EPA licence for this area will be considerable and will take an extended timeframe.
Calculated estimated costs are provided in 5-year increments adjusted for inflation. A significant amount of figures over a 55-year timespan are provided, and I would recommend looking at the report in the business paper for a table with a breakdown of these figures, but over 55 years the estimated combined cost of cell construction and capping is $86,012,317, with capping maintenance at $40,274,149.
Governance, Strategy and Finance
Item 9.1 – Council Investments October 2025
The October Investment report advises that as of the 24th of October 2025, TRC’s portfolio performed above the industry average, returning 4.35% against the three-month Bank Bill Swap rate of 3.50%. Down slightly when compared to the 4.40% average return in September 2025.
Notably the Australian Bureau of Statistics published inflation data from late October showing that annual headline inflation jumped to 3.2% in the September quarter, up from 2.1 per cent in June. And as widely predicted by economists as a result, the Reserve Bank of Australia kept the interest rates at 3.6%. While this is bad news for mortgage holders, it is a slight positive for interest earned on TRC’s investments.
Item 9.2 – Tamworth Regional Council Consolidated Financial Reports for Period Ended 30 June 2025
TRC’s Financial Reports for the period ending on the 30th of June 2025 have now been audited and lodged with the Office of Local Government. The Auditor General has also supplied unqualified Financial Audit Reports in relation to Council’s Consolidated Fund, as well as for Council’s Water, Sewerage, Waste, Airport and Pilot Training Facility Business Operations. This item is to present these reports to Councillors and the public.
In accordance with Section 420 of the Local Government Act 1993 (NSW), any person may make a submission in writing to Council with respect to the Council’s Audited Financial Statements or the Auditor’s Reports. TRC’s website was updated on 3 November 2025, to advise the community that the financial reports were being presented at this Meeting and were available on Council’s website, and that submissions could be made within seven days of the Meeting. You can find that link here:
There’s a lot of information to cover in these reports, and I won’t do it justice in this post. But the headline figures are that the consolidated financial results are that TRC’s total continuing operational income was $272,929,000, continuing operating expenses were $201,903,000, resulting in a net continuing operating result of $71,026,000.
This is a significant increase in Council’s Net Operating Result from Continuing Operations of $38.1M from the 24/25 Financial Year. But the report states that this increase is largely due to “gifted” assets from other levels of government in the form of assets related to the Dungowan Dam Pipeline as well as Rangari Road infrastructure. It’s also warned in the report that gifting of assets comes with future maintenance liabilities. Compared to the 23/24 financial year non-cash contributions increased by $42.6M.
It’s advised that if all grant income and contributions (cash and non-cash) were removed from TRC’s income statement for the last two financial years TRC’s income for 24/25 when compared to the 23/24 financial year increased by $12.9M. And that this increase is due to increased rates and annual charges along with improved returns on Council’s investments.
It further advises that when compared to the previous financial year TRC’s expenditure increased by $15M. Reasons for this increase in expenditure include increased loss on disposal of assets including a $4.7M loss on the decommissioning of the old Dungowan Dam Pipeline.
Community Services
Item 10.1 – Sri Lanka Versus Australia Over 65 Series Fee Waiver Request – Tamworth Veterans Cricket
Both items in Community Services are requesting Councillor approval for fee waivers for sporting events. The first is a request from Tamworth Veterans Cricket to waive the fees associated with hosting the touring Australian and Sri Lanka over 65’s Masters Series in Tamworth from 8 to 10 March 2026 at No. 1 Oval. $1,795.40 total for venue hire, preparation and promotional signage.
Under TRC’s Sport Event Subsidisation Policy this event would qualify for a 20% fee subsidy. However it’s recommended to Councillors that as this event would present an opportunity to promote Tamworth’s sporting infrastructure to an international audience and demonstrate the city’s capacity to host major sporting events we instead approve a full fee waiver.
The Sport Event Subsidisation Policy has an annual budget reserve of $44,071.00, if the full fee waiver is approved this reserve would have a remaining balance of $32,235.60.
Item 10.2 – Hockey NSW Funding Request
TRC are in discussions with Hockey NSW to potentially bring a NSW Boys State Championships to Tamworth in 2026 which is expected would attract more than 800 competitors from all over NSW over three days. As a result, this event is estimated to have an economic benefit of $681,377.
Council staff have also been working closely with Tamworth Hockey Association (THA), who are planning to assist Hockey NSW in the running of the event, scheduled to be held from 17 to 19 July 2026 at the Tamworth Hockey Complex. THA are very keen to host the NSW Under 16 Boys event as it will be on the back of their annual York Cup and Kim Small Shield carnival, where all required marquees and support infrastructure will already be installed around the facility. Hosting these two significant events over consecutive weekends allows this infrastructure to be installed and then used twice before having it removed from site.
Hockey NSW are seeking a cash contribution of $10,000 from TRC to help offset their costs for hosting an event in a regional area as well as reducing the associated cost to players to participate. The recommendation to Councillors is to approve this $10,000 contribution from the General Fund.
Closed Council
Rounding out the meeting we have two items in closed Council. Item 12.1 is seeking authorisation from Councillors to negotiate and enter into a licence agreement in relation to the International Flight Training Tamworth (IFTT) Kitchen and Dining Hall.
Item 12.2 is recommending that Councillors resolve to not accept tenders received for design and construction of an Engine Shed extension at the PowerStation Museum to instead enter into negotiations with one or more of the tenderers. The reason given being that during this project planning phase, extensive complications and delays were encountered due to various site constraints, including proximity to boundaries, building over sewer, heritage impacts and car parking, necessitating extensive assistance from consultants to obtain development consent. Due to budget constraints, TRC needs to negotiate details with preferred tenderer(s) to refine the scope of work to achieve an affordable outcome, and therefore cannot accept a tender at this stage.